首页> 外文会议>Workshop on high dam know-how China >Brief Introduction to Sand-gravel Dam Seepage Control Construction Technologies for Xixiayuan Counter Reservoir with Inclined Compound Geomembrane Core
【24h】

Brief Introduction to Sand-gravel Dam Seepage Control Construction Technologies for Xixiayuan Counter Reservoir with Inclined Compound Geomembrane Core

机译:辛西源柜台储层砂砾坝渗流控制施工技术简介,复合化合物土工膜芯

获取原文

摘要

@@1 Project BriefThe Xixiayuan Counter Reservoir is located on the mainstream of the Yellow River in HenanProvince, 16km downstream of Xiaolangdi Multipurpose Dam Project, with a total catchmentarea of 694,600km2 above the dam site. This is a large-sized multipurpose dam project mainlyfor counter regulation, but also for power generation, water supply and irrigation, with a totalstorage capacity of 162 million m3, a maximum height of 20.2m in the sand-gravel section and51.5m in the concrete section, a total installed capacity of 140MW, and an irrigation area of1.138 million mu.
机译:@@ 1项目简介西霞源对手水库位于河南省黄河的主流,下游Xiaolangdi多功能大坝项目下游16公里,总涌入坝址为694,600公里。这是一个大型多功能大坝项目,主要是对抗调节,而且还可用于发电,供水和灌溉,总勤工能力为1.62亿立方米,砂砾部分最高高度为20.2米,51.5米混凝土部分,总装机容量为140MW,灌溉面积为1.138万亩。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号