@@1 Project generalizationJilintai-1 hydropower station is the tenth station in the planning of Kashi River basin, which is32km from Nileke County in west direction and located in the middle part of Jilintai gorgewhere Kashi River passing. For the said water power station, the total installed power capacity is460MW, the total storage capacity is 2.53 billion m3, the design flood water level is 1420.0m andthe dead water level is 1380.0m. The dam is concrete face sandy gravel rockfill dam with theheight of 157m and with 445m of crest length. The upstream face slope of which is 1:1.7 and thedownstream face slope is 1:1.96. To the dam face slab, area is 75250m2, the maximum sidelinelength is 256.7m.
机译:@@ 1项目普遍化jilintai-1水电站是喀什河流域规划的第十站,距尼西县西方方向32km,位于吉丽泰戈恩郡的中部喀什河流。对于上述水电站,总安装的电力容量为460mW,总存储容量为25.3亿立方米,设计洪水水平为1420.0米,死水水平为1380.0米。大坝是混凝土面料砂岩堆石坝,其厚度为157米,占445米的嵴长度。上游脸部坡度为1:1.7和1:1.96。到坝面板坯,面积为75250m2,最大侧链长度为256.7m。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号