【24h】

METALLURGICAL DESIGN ISSUES AT CIRQUE DU SOLEIL

机译:Cirque du Soleil的冶金设计问题

获取原文

摘要

The modern live entertainment industry poses a number of interesting engineering problems in the design and use of large, dynamic, theatrical stage components, which can be on the order of 10s of meters in length and 100s of metric tons in moving mass. A prime example of these types of stage components can be seen at the Cirque du Soleil show Ka. Since show opening in 2005, a number of the components of the Gantry Lift, the main stage system, have needed modification to correct operational issues that arose from the initial design(s). This paper will focus on how mathematical modeling and analysis of the as-built components has been conducted to correct and improve operation of the stage system. In particular, this paper will describe the linear static structural calculations which have been used as the basis for component redesign to alleviate fatigue failure in the stage system.
机译:现代现场娱乐业在设计和使用中提出了许多有趣的工程问题,大型,动态,戏剧阶段部件,可以大约10米的长度和100米在移动质量上的公吨。可以在Cirque du Soleil Show Ka看到这些类型的阶段组件的主要示例。由于2005年的展开开头,龙门升降机的许多部件,主级系统,需要修改,以纠正从初始设计中产生的操作问题。本文将侧重于如何进行校正和改进阶段系统的校正和改进操作的数学建模和分析。特别是,本文将描述已被用作组件重新设计以减轻舞台系统中疲劳失败的基础的线性静态结构计算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号