首页> 外文会议>Portland International Conference on Management of Engineering Technology >Impacts to Productivity in Metal Stud Framing, and the Hanging and Finishing of Gypsum Drywall
【24h】

Impacts to Productivity in Metal Stud Framing, and the Hanging and Finishing of Gypsum Drywall

机译:对金属螺栓框架的生产率的影响,以及石膏干墙的悬挂和精加工

获取原文

摘要

Stud Framing, Drywall, and Tape and Finishing trade-work is a major component of every building project. Labor productivity is the largest single variable affecting of the Framing and Drywall contractors' cost of performance. In spite of these facts, no major study of labor productivity in this major construction trade has previously been done. This study was undertaken to fill this gap in the literature; specifically to investigate external impacts to labor productivity in this construction sector. The study measured the impact of thirty-eight (38) variables on 226 separate projects. The study found that poor quality design documents, unexpected labor congestion, fragmentation, and overtime and added shift work negatively impacted labor productivity.
机译:螺栓框架,干墙和胶带和整理贸易工作是每个建筑项目的主要组成部分。劳动生产率是最大的单一变量影响框架和干墙承包商的性能成本。尽管有这些事实,但先前没有对这一主要建筑贸易中的劳动生产率进行重大研究。本研究旨在填补文献中的这种差距;特别是调查该建筑行业劳动生产率的外部影响。该研究测量了226个单独项目的三十八(38)个变量的影响。该研究发现,质量设计文件差,意外的劳动力充血,碎片和加班费和加班工作带来了负面影响的劳动生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号