Stud Framing, Drywall, and Tape and Finishing trade-work is a major component of every building project. Labor productivity is the largest single variable affecting of the Framing and Drywall contractors' cost of performance. In spite of these facts, no major study of labor productivity in this major construction trade has previously been done. This study was undertaken to fill this gap in the literature; specifically to investigate external impacts to labor productivity in this construction sector. The study measured the impact of thirty-eight (38) variables on 226 separate projects. The study found that poor quality design documents, unexpected labor congestion, fragmentation, and overtime and added shift work negatively impacted labor productivity.
机译:螺柱框架,干墙以及胶带和涂饰行业是每个建筑项目的主要组成部分。劳动生产率是影响框架和干式墙承包商的绩效成本的最大单一变量。尽管有这些事实,以前还没有对这一主要建筑行业中的劳动生产率进行过重大研究。进行这项研究是为了填补文献中的空白。专门调查此建筑部门对劳动生产率的外部影响。该研究测量了三十八(38)个变量对226个单独项目的影响。该研究发现,质量差的设计文档,意外的劳动力拥堵,分散化和加班时间以及增加的轮班工作会对劳动生产率产生负面影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号