【24h】

Monitoring of Polymer flood project at Sanand field of India

机译:印度Sanand领域的聚合物洪水项目监测

获取原文

摘要

Sanand is the only oil field in India where field-scale polymer flooding is going on for the last twelve years. The field was discovered in 1962 and commercial production commenced from 1969. In view of high mobility contrast and predicted poor recovery of around 15% of OIIP under depletion drive, polymer flooding was adopted as an IOR process for improving oil recovery from this field. An inverted five spot polymer pilot project was started in 1985. Based on the encouraging result of the pilot, the polymer injection project was expanded to a larger area in 1993 and field-scale implementation has commenced from 1995. As on July 2007, the recovery from the field is around 24% with 68% water cut. Envisaged recovery from the field is around 36% with 77% water cut by 2020 with continuance of polymer injection up to 2013 followed by chase water. Maintenance of quality of polymer solution and chase water for such a long period is a real challenge to the professionals associated with the project and plays a key role for the success of the polymer injection project. For this, continuous surveillance of the entire process is required to ensure effectiveness of the project and take mid course correction, if required. The different monitoring aspects involve in the process are-a) performance of producers, b) rheology of polymer at different points of injection system, c) water quality and other parameters affecting the polymer viscosity, such as dissolved oxygen, bacterial activity and d) injection well rate, pressure and performance. This paper aims to present main practices followed for maintaining the quality of injection polymer/chase water and other process parameters and to show how it has helped to improve the efficiency and effectiveness of the polymer IOR technique in Sanand field.
机译:Sanand是印度唯一的油田,过去的十二年来的现场规模的聚合物洪水正在发生。该领域于1962年发现,从1969年开始的商业生产。考虑到高迁移率造影和预测在耗尽驱动下占OIIP的15%较差,采用了聚合物洪水作为改善该领域的石油回收的过程。倒五点聚合物试点项目于1985年开始。根据试点的令人鼓舞的结果,将聚合物注射项目于1993年扩大到更大的区域,现场规模实施从1995年开始。截至2007年7月,恢复来自该领域的含水率为68%。设想从该领域的回收率约为36%,达到2020年的77%的污水,高分子注射持续到2013年,然后追逐水。维持聚合物溶液的质量和追逐水的追逐,这是对与项目相关的专业人士的真正挑战,并对聚合物注射项目的成功发挥关键作用。为此,需要持续监测整个过程,以确保项目的有效性并在需要时进行中期校正。不同的监测方面涉及过程中的方法是-A)生产者的性能,B)聚合物的流变学,在不同的注射系统点,C)水质和其他参数影响聚合物粘度,如溶解氧,细菌活性和D)注射井速率,压力和性能。本文旨在提出主要实践,以维持注射聚合物/追踪水和其他工艺参数的质量,并展示如何有助于提高Sanand领域的聚合物IOR技术的效率和有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号