【24h】

Monitoring of Polymer flood project at Sanand field of India

机译:印度Sanand领域的聚合物洪水项目监测

获取原文

摘要

Sanand is the only oil field in India where field-scale polymer flooding is going on for the last twelve years. The field was discovered in 1962 and commercial production commenced from 1969. In view of high mobility contrast and predicted poor recovery of around 15% of OIIP under depletion drive, polymer flooding was adopted as an IOR process for improving oil recovery from this field. An inverted five spot polymer pilot project was started in 1985. Based on the encouraging result of the pilot, the polymer injection project was expanded to a larger area in 1993 and field-scale implementation has commenced from 1995. As on July 2007, the recovery from the field is around 24% with 68% water cut. Envisaged recovery from the field is around 36% with 77% water cut by 2020 with continuance of polymer injection up to 2013 followed by chase water. Maintenance of quality of polymer solution and chase water for such a long period is a real challenge to the professionals associated with the project and plays a key role for the success of the polymer injection project. For this, continuous surveillance of the entire process is required to ensure effectiveness of the project and take mid course correction, if required. The different monitoring aspects involve in the process are-a) performance of producers, b) rheology of polymer at different points of injection system, c) water quality and other parameters affecting the polymer viscosity, such as dissolved oxygen, bacterial activity and d) injection well rate, pressure and performance. This paper aims to present main practices followed for maintaining the quality of injection polymer/chase water and other process parameters and to show how it has helped to improve the efficiency and effectiveness of the polymer IOR technique in Sanand field.
机译:Sanand是印度唯一的油田,在过去的十二年中,现场规模的聚合物洪水正在发生。该领域在1962年发现,商业生产从1969年开始开始。考虑到高迁移率造影和预测在耗尽驱动下的OIIP占15%的较差,采用了聚合物洪水,以改善该领域的石油回收。倒五点聚合物试点项目于1985年开始。根据飞行员的令人鼓舞的结果,将聚合物注射项目扩大到1993年的较大领域,现场规模实施从1995年开始。截至2007年7月,恢复来自该领域的24%左右,含有68%的污水。从场地设想的恢复约为36%,含有77%的水,2020次净水,高分子注射持续到2013年,其次是追逐水。维持高分子溶液的质量和追逐水的追逐,这是对项目相关的专业人员的真正挑战,并对聚合物注射项目的成功作出关键作用。为此,需要持续监测整个过程,以确保项目的有效性,并在需要时进行中期校正。不同的监测方面涉及过程中的方法是-A)生产者的性能,b)聚合物在不同注射系统点的流变学,c)水质和其他参数影响聚合物粘度,如溶解氧,细菌活性和D)注射井速率,压力和性能。本文旨在呈现主要实践,以保持注射聚合物/追踪水和其他工艺参数的质量,并展示如何帮助提高Sanand领域的聚合物IOR技术的效率和有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号