New Completion Technology As A Catalyst to Improve Oil Recovery

机译:新的完工技术作为提高储油恢复的催化剂

获取原文

摘要

This paper presents the reservoir considerations, implementation and results of a new completion technology with the aim to improve ultimate recovery. The non-uniform production profile across the horizontal hole especially in the highly heterogeneous and fractured reservoirs can result in premature water production and lower ultimate recovery. PLT surveys were carried out in some horizontal wells which indicated non-uniform production profile across the horizontal holes. Therefore the need for production system as part of the completion was raised to control water production and to improve ultimate recovery. This completion technique will the low and high permeability intervals to contribute to flow was found to be the optimum option for this highly heterogeneous and fractured reservoir. Horizontal hole segmentation using ICD (Inflow Control Device) completion was found to be the optimum option to be tested as pilot in a new and an existing wells. The new well was expected to penetrate highly fractured area and the existing well is also located in highly fractured area. The ICD Equalizer system was installed in both wells to evaluate the technique. The surface testing results of the re- completed well indicated a drop in the well water cut from 7% to traces. PLT survey was carried out in both wells and indicated uniform production profile across the horizontal section. Therefore the reliability of the technique was proved and these jobs were considered as the first application in United Arab Emirates. With field scale implementation, the reservoir simulation and economic analysis revealed an improved oil recovery of 1% and higher NPV.
机译:本文介绍了新建技术的水库考虑,实施和结果,旨在提高终极恢复。横跨水平孔的非均匀生产曲线,特别是在高度异质和裂缝的储层中可能导致水生产过早和较低的终极回收率。在一些水平孔中进行PLT调查,该水平井在水平孔上表示不均匀的生产曲线。因此,作为完成的一部分,对生产系统的需求提高以控制水产量并改善最终的恢复。该完成技术将贡献流量的低和高渗透间隔是该高度异构和裂缝储层的最佳选择。使用ICD(流入控制设备)完成的水平孔分割被发现是在新的和现有井中作为飞行员进行测试的最佳选择。预计新井将渗透高度裂缝区域,现有的井也位于高度骨折区域。 ICD均衡器系统安装在两个井中以评估该技术。重建良好的表面测试结果表明井水中的液滴从7%切割成痕迹。 PLT调查在两个孔中进行,并在水平部分上表明了均匀的生产曲线。因此,证明了该技术的可靠性,这些工作被认为是阿拉伯联合酋长国的第一个申请。凭借现场规模实施,储层模拟和经济分析显示出改善的溢油率为1%和更高的NPV。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号