首页> 外文会议>HydroVision Conference >Improving System Performance with Advanced Controls Upgrades - How to Make it Happen
【24h】

Improving System Performance with Advanced Controls Upgrades - How to Make it Happen

机译:通过高级控件升级提高系统性能 - 如何使其发生

获取原文

摘要

Many hydroelectric plant operators have begun replacing their governor controllers with state of the art off the shelf PLC systems. During the scope development phase of their governor replacement project, the Sacramento Municipal Utility District (SMUD) saw an opportunity to upgrade and standardize their turbine shutoff valve (TSV) control systems as well. SMUD has contracted with System 3, Inc (Carmichael, CA) and North American Hydro (Schofield, WI) to upgrade the governors and TSV control systems at 7 powerhouses (10 units total) in SMUD's Upper American River Project (UARP). Project scope also includes installation of new human machine interface (HMI) personal computers in each powerhouse and maintenance headquarters that intercommunicate over a fiber optic network and provide personnel with control system status and historical control data from any powerhouse in the UARP. The project scope and benefits of PLC governor upgrades, standardization of the TSV controls, system integration and historical logging of all powerhouse control data will be discussed.
机译:许多水电站运营商已经开始用架子PLC系统的艺术状态替换他们的调速器控制器。在其州长更换项目的范围开发阶段,萨克拉门托市政公用事业区(SMUD)也有机会升级和标准化其涡轮机截止阀(TSV)控制系统。 Smud与System 3,Inc(Carmichael,CA)和北美水电(Schofield,Wi)合同,以在Smud的上美国河流项目(UARP)中以7个Powerhouses(10个单位)升级州长和TSV控制系统。项目范围还包括在每个强大的人机界面(HMI)个人电脑上安装在每个省级和维护总部的个人计算机,这些总部通过光纤网络互通,并提供来自UARP中的任何省电者的控制系统状态和历史控制数据的人员。将讨论PLC调速器升级的项目范围和优势,TSV控制标准化,系统集成和所有能源控制数据的历史记录。

著录项

  • 来源
    《HydroVision Conference》|2008年||共12页
  • 会议地点
  • 作者

    Will Pope;

  • 作者单位
  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类 TV7-53;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号