首页> 外文会议>HydroVision Conference >New Hydropower Development on the Ohio River
【24h】

New Hydropower Development on the Ohio River

机译:俄亥俄州河流新的水电开发

获取原文

摘要

This paper summarizes the navigation development of the Ohio River, the existing and potential hydropower of the Ohio River, and presents an overview and status of the ongoing development of three new hydropower projects on the Ohio River. American Municipal Power-Ohio, Inc. (AMP-Ohio) is developing the three projects at existing US Army Corps of Engineers (USACE) locks and dams. The projects will develop about 191 MW of renewable energy. The Willow Island Hydroelectric Project is located at the Willow Island Locks and Dam and will be a two-unit powerhouse with an estimated generation capacity of 35 MW. The Cannelton Hydroelectric project is located at Cannelton Locks and Dam and will be a three-unit powerhouse with an estimated capacity of 82 MW. The Smithland Hydroelectric project is located on the Kentucky shore at the Smithland Locks and Dam and will be a three-unit powerhouse with an estimated capacity of 74 MW.
机译:本文总结了俄亥俄州河流,现有和潜在水电的导航发展,概述了俄亥俄州三个新水电项目的持续发展。 American Municipal Power-Ohio,Inc。(AMP-oomio)正在开发现有美国陆军工程师(USACE)锁和水坝的三个项目。该项目将制定约191兆瓦的可再生能源。柳岛水电项目位于柳树岛锁和大坝,将是一个双单位的电力房,估计发电量为35兆瓦。 Cannelton水电项目位于Cannelton Locks和Dam,并将成为一个三单元的动力士,估计容量为82兆瓦。 Smithland水电项目位于斯金兰锁和大坝的肯塔基州,将是一个三单元的强力厂,估计容量为74兆瓦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号