首页> 外文会议>International Conference Modern Technique And Technologies >DEVELOYMENT OF 5-YEAR REFUELLING CYCLE AT DUKOVANY NUCLEAR POWER PLANT, CZECH REPUBLIC
【24h】

DEVELOYMENT OF 5-YEAR REFUELLING CYCLE AT DUKOVANY NUCLEAR POWER PLANT, CZECH REPUBLIC

机译:Dukovany核电站,捷克共和国5年的加油周期开放

获取原文

摘要

In PWR fuel enrichment is permanently increased together with the content of burning absorbers with the aim to improve characteristics of burning and reduce fuel costs at the energy market. In parallel, deployment of a new generation of advanced PWR 440 fuel types implies further development of the fuel cycle of the Dukovany NPP as a more aggressive policy of fuel charges reduce fuel costs. To achieve the economic advantage offered by these new fuel types and maintain the level of safety and reliability of reactor operation the process of charge design is continuously improved together with safety assessment and introduction of advanced procedures of on line monitoring of the reactor core. In 2003 the first fuel charges with the new generation fuel were deployed in units one and two of the Dukovany NPP to burn in the reactors for five years. This change, i.e. the transition from the four- to the five-year cycle, concerns the working fuel assemblies while the regulation assemblies remain in the four-year cycle. The remaining power plant units were transferred to the five-year cycle in the years 2004 and 2005.
机译:在PWR燃料富集中永久地增加了燃烧吸收剂的含量,旨在改善燃烧的特性,降低能源市场的燃料成本。同时,新一代高级PWR 440燃料类型的部署意味着Dukovany NPP的燃料循环进一步发展,作为燃料收费的更积极的政策,降低了燃料成本。为实现这些新燃料类型提供的经济优势,并维持反应堆操作的安全性和可靠性,将充电设计的过程与安全评估和引入电氢核的线路监测的先进程序一起进行了持续改善。 2003年,新一代燃料的第一款燃料收费以单位和两个在Dukovany NPP中部署,在反应器中燃烧五年。这一变化,即从四到五年周期的过渡,涉及工作燃料组件,而调节组件仍处于为期四年周期。剩余的电厂单位于2004年和2005年转移到五年周期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号