首页> 外文会议>International Conference of Architecture and Technology >The Risk Simulation of Investment on Construction Projects in the Absence of Historical Data
【24h】

The Risk Simulation of Investment on Construction Projects in the Absence of Historical Data

机译:历史数据缺失施工项目投资的风险模拟

获取原文
获取外文期刊封面目录资料

摘要

As the correctness of investment decision-making depends directly on the accuracy of me risk estimate,it is of great significance to learn how to measure the risk of investment projects in the absence of historical data. Under the condition, investment projects are allover uncertain models, the building of which involves uncertain factors(risk factors)including market tendency, project time limit, investment accounts, operation income and so on. Meanwhile,because the major risk factors that affect the project investments are subject to Beta Distribution, the risk simulation analysis aided by computer is an effective way to solve problems of this kind, which exemplifies that the precision is reliable and future analyzes simulation results.
机译:由于投资决策的正确性直接取决于我的风险估计的准确性,因此了解如何在没有历史数据的情况下衡量投资项目的风险具有重要意义。在该条件下,投资项目是全星的不确定模式,其中建筑涉及不确定因素(风险因素),包括市场趋势,项目时间限制,投资账户,运营收入等。同时,由于影响项目投资的主要风险因素受到Beta分配的影响,计算机辅助的风险模拟分析是解决这种问题的有效方法,这例示了,精度是可靠的,未来的分析结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号