首页> 外文会议>American Water Works Association water quality technology conference exposition >Building on 20+ Years of Corrosion Control Optimization with Inhibitor Pre-qualification in Pinellas County Florida
【24h】

Building on 20+ Years of Corrosion Control Optimization with Inhibitor Pre-qualification in Pinellas County Florida

机译:在Pinellas County佛罗里达州抑制剂预验证20多年的腐蚀控制优化建设

获取原文

摘要

This paper presents a corrosion inhibitor pre-qualification study for the Pinellas County Water System (PCWS). Pinellas County owns and operates an extensive water distribution network comprising approximately 2,000 miles of water piping, six booster pump stations, ground storage reservoirs, pressure reducing valves and elevated storage tanks that serves nearly 800,000 customers along Florida's central west coast. The sheer size and complexity of the County's system, combined with the use of chloramine disinfection, multiple distribution system points of entry, and variable blend of ground, surface and desalinated sources, makes for a challenging system to monitor and maintain. One of the County's longstanding successes has been their optimized corrosion control program. The success is highlighted by numerous corrosion investigations to resolve corrosion problems that first became apparent through reports of leaking copper pipes in homes and apartment complexes in the early 1970's. Since that time, the County determined a combination of pH control and proprietary orthopolyphosphate corrosion inhibitor addition is the best available practice for controlling lead and copper release. This methodology has remained effective for their regional blended ground, surface and desalted water supply that is disinfected with chloramine. Water supply is provided by the regional water authority, Tampa Bay Water. In light of escalating water treatment chemical costs, the County embarked on a program to pre-qualify alternate products for competitive bidding. This followed prior formal tests of alternative products to the original product in 1994 and 2003. The subsequent testing and competitive bids lead to contract extensions with the original vendor when products with comparable performance were not found or when the price of competitive products was higher.
机译:本文介绍了Pinellas县水系统(PCW)的腐蚀抑制剂预认证研究。 Pinellas County拥有并经营广泛的水分配网络,包括大约2000英里的水管,六个加强泵站,地面储存储存器,减压阀和高架储罐,距离佛罗里达州的中西海岸近80万百合。该县系统的纯粹规模和复杂性,结合使用氯胺消毒,多种分配系统的入口点,以及地面,表面和脱盐源的可变混合物,使得一个具有挑战性的系统来监测和维护。该县的长期成功之一是其优化的腐蚀控制计划。通过众多腐蚀调查来解决腐蚀问题的成功,通过在20世纪70年代早期泄漏了家庭和公寓综合体泄漏铜管,首先变得明显的腐蚀问题。从那时起,县确定了pH控制和专有的正氨基磷酸腐蚀抑制剂的组合是控制铅和铜释放的最佳实践。这种方法对其与氯胺消毒的区域混合地基,表面和脱盐供水保持有效。水源由区域水务局,坦帕湾水提供。鉴于水处理化学成本不断升级,该县开始了一项计划预先获得竞争竞标的替代产品。这遵循了1994年和2003年的原始产品的前面的正式测试。随后的测试和竞争出价导致原始供应商的合同扩展,当没有找到具有可比性的产品或竞争产品价格较高时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号