首页> 外文会议>Narrow Vein Mining Conference >Resource Estimation and Grade Assignment - A Comparison Between Historical Production and Current Maxwell Mining Validation Case Study at Morning Star Gold Mine, Woods Point
【24h】

Resource Estimation and Grade Assignment - A Comparison Between Historical Production and Current Maxwell Mining Validation Case Study at Morning Star Gold Mine, Woods Point

机译:资源估算与等级作业 - 历史生产与麦克斯韦尔矿业验证案例研究的比较,晨星金矿,伍兹

获取原文

摘要

The Morning Star Gold Mine has operated over a 101-year period, producing gold from narrow quartz veins and sulfide stockworks hosted mainly within a dioritic-gabbroic dyke. The deposit has been developed over a vertical depth of 980 m with drilling extending the vertical depth to greater than 1200 m. Currently there is a total Inferred Resource of 4.6 million tonnes at a grade of 6 g/t for 910 000 ounces of contained gold resources, which comprises an underground project and a surface project. Significant variation exists between the grade of drill core intersections and that observed in face sampling and subsequent production reconciliation (250 - 650 per cent). Studies were carried out on ten major production reefs, where the grades of drill intercepts were compared with face samples collected during development and mining. The implications of this study have been used as justification to assign production or stope/development grades where applicable to resources that are direct extensions of the historical development headings. Grade assignment and its impact on sensitivity for gold resources are detailed and show a 40 per cent variation in the gold resource, depending upon whether a production or calculated stope grade is used in grade assignment for the major reef deposits. Recent diamond drilling has intersected approximately 40 new gold bearing quartz reefs and sulfide zones that contain all the key mineralogical and structural indicators, and traditional large variations in gold grades similar to the historical major production zones. The implications of grade factoring and grade assignment are the greatest challenges confronting the resource estimation team in defining grade for these new zones. Grade assignment is seen as a method of balancing known historical production observations with the irregular grade distribution inferred from drill core assay results. Ongoing mine development and bulk sampling works are planned to validate the grade assignment process. The first stage of this process is the trial mining of the newly discovered Maxwell Reef (MR). The stope drawpoints were completed in August 2008 and the MRS1 stope is scheduled for completion in September. The stope reconciliation results will be presented at the October 2008 conference.
机译:早晨的明星金矿在101年期间运营,从狭窄的石英脉和主要托管的狭窄石英静脉和硫化物片,主要是在Dioritic-Gabbroico堤上举办。该矿床在980米的垂直深度上开发,钻孔延伸到大于1200米。目前,总推断资源为460万吨以6亿吨,占91万盎司的金资源,包括地下项目和地表项目。钻孔芯交叉等级之间存在显着的变化,并且在面部采样和随后的生产和解(250-650%)中观察到的。在十大主要生产礁中进行了研究,其中将钻探截障等级与在开发和采矿过程中收集的面部样品进行比较。本研究的含义已被用作分配适用于历史发展标题的直接扩展的资源的制作或处置/开发等级的理由。等级分配及其对黄金资源灵敏度的影响,并显示了黄金资源的40%变化,具体取决于生产或计算的STOPE等级是否用于主要珊瑚礁矿床等级分配。最近的钻石钻孔相交了大约40个新的金色轴承石英珊瑚礁和硫化物区,含有所有关键的矿物学和结构指标,以及与历史主要生产区相似的金级的传统大变化。等级分解和等级分配的影响是对这些新区域定义级别的资源估算团面临的最大挑战。等级分配被视为平衡已知的历史生产观察的方法,其与钻孔核心测定结果推断出不规则级分布。计划正在进行的矿山开发和批量采样作品验证等级分配过程。这个过程的第一阶段是新发现的Maxwell Reef(MR)的试用开采。 Stope DrawPoints于2008年8月完成,并于9月份安排了MRS1 STOPE完成。 Stope和解结果将在2008年10月大会上提出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号