首页> 外文会议>IEEE Region 5 Conference >Voltage Inversion due to TCSC Presence on Second Circuit of Double Circuit Line and Distance Relay Mal-Operation Considering MOV Operation
【24h】

Voltage Inversion due to TCSC Presence on Second Circuit of Double Circuit Line and Distance Relay Mal-Operation Considering MOV Operation

机译:电压反转由于TCSC的存在在第二电路线和距离继电器的第二电路上,考虑MOV操作

获取原文

摘要

This paper discusses the distance relay mal-operation in the case of installation of Thyristor Controlled Series Compensator (TCSC), one of the series connected Flexible Alternating Current Transmission System (FACTS) device, on the second circuit of a double circuit transmission line, considering its Metal Oxide Varistor (MOV) operation. This is done by means of presenting the measured impedance at the relaying point in the case of TCSC presence at the near end of the second circuit. The measured impedance at the relaying point is greatly influenced in the presence of TCSC on the line or even in the case of installing TCSC on the near end of the second circuit. The measured impedance depends on many factors including the power system structural conditions, pre-fault loading, the ground fault resistance, and TCSC compensation degree.
机译:本文讨论了晶闸管控制系列补偿器(TCSC)的安装情况下的距离继电器混合操作,其中一系列连接的柔性交流传输系统(事实)设备,考虑到了双电路传输线的第二电路。其金属氧化物变阻器(MOV)操作。这是通过在第二电路近端的TCSC存在的情况下呈现中继点处的测量阻抗来完成的。中继点处的测量阻抗在线上的TCSC存在下很大影响,甚至在第二电路的近端安装TCSC的情况下也是如此。测量阻抗取决于许多因素,包括电力系统结构条件,故障前负载,接地故障电阻和TCSC补偿程度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号