On January 2, 2011 the US Environmental Protection Agency (USEPA) began regulating emissions of greenhouse gases (GHG). At the same time developers were completing front-end engineering and designs of projects to expand power generation capabilities and struggling with the uncertainty of rapidly evolving, and in some cases, ambiguous regulations and guidance. Faced with this uncertain permitting environment and with the prospect of setting precedents for GHG BACT, utilities have had to work hand in hand with their consultants and regulators to draft permits that meet regulatory and public expectations while balancing the need for operational flexibility and compliance. This paper will provide practical experience in balancing those needs.
机译:2011年1月2日美国环境保护局(USEPA)开始调节温室气体排放(GHG)。同时开发人员正在完成前端工程和项目的项目,以扩大发电能力,并在一些情况下,在某些情况下,削弱规定和指导的不确定性。面对这一不确定的允许环境,并在为温室气体设定先例的前景,公用事业公司必须与他们的顾问和监管机构携手合作,以达到符合监管和公共期望的许可证,同时平衡运营灵活性和遵守的必要性。本文将提供平衡这些需求的实践经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号