首页> 外文会议>AWEA Wind Resource and Project Energy Assessment Workshop >Shear Extrapolation by David Matson Allen Becker V-Bar, LLC - (PPT)
【24h】

Shear Extrapolation by David Matson Allen Becker V-Bar, LLC - (PPT)

机译:David Matson&Allen Becker V-Bar,LLC的剪切推断 - (PPT)

获取原文

摘要

Uncertainties are a part of wind resource assessment and will not disappear. Wind shear represents an important part of the evaluation process, with hub height wind speeds extrapolated from what we know of winds at lower levels. Uncertainty in shear calculations is one of the largest contributions of all the uncertainties we deal with regularly. Other uncertainties include, but are not limited to, sensor accuracy, long-term reference site period of record and quality, reference versus onsite speeds, and turbine micrositing. The ideal solution would be to always measure winds at hub height, but this is more expensive and not always practical. In the future, as turbine size increases, turbine hub heights will increase. Measuring winds at hub height will become more important, and continued efforts are required to reduce this large uncertainty. Until hub height measurements are made, sensors should be placed at well-spaced intervals, starting 10 meters above ground level, or 10 meters above effective tree height.
机译:不确定性是风力资源评估的一部分,不会消失。风力剪切代表评估过程的重要部分,轮毂高度风速从我们在较低级别所知的风中推断出来。剪切计算的不确定性是我们定期处理所有不确定性的最大贡献之一。其他不确定性包括但不限于传感器准确性,长期参考现场的记录和质量,参考与现场速度以及涡轮机微量。理想的解决方案是始终在轮毂高度测量风,但这更昂贵,而且并不总是实用。将来,随着涡轮机尺寸的增加,涡轮机枢纽高度将增加。测量轮毂高度的风将变得更加重要,并且需要持续的努力来减少这种大的不确定性。在制作集线器高度测量之前,传感器应以良好间隔的间隔放置,从地面10米处开始,或高于高于有效树高的10米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号