At the start of the project there were many challenges: define the boundaries of operation of the test cell, achieve uniform L/G, quantify wall water by-pass, pick accurate and redundant instrumentation, establish a "baseline", etc. Research, patience and perseverance are indispensable ingredients to address the challenges one by one. But after several weeks spent debugging and fine-tuning the installation, the baseline tests came out on target. The knowledge acquired from the fill test cell is not enough. The final proof comes from full scale field tests. But this is another story. "The joy of engineering is to find a straight line on a double logarithmic diagram", Thomas Koenig, University of Karlsruhe (Germany).
机译:在项目开始时存在许多挑战:定义测试单元的运行边界,实现均匀的L / g,量化壁旁路,挑选准确和冗余仪表,建立“基线”等研究,耐心和毅力是一个不可或缺的成分,以逐一解决挑战。但经过几周花费调试和微调安装后,基线测试出现在目标上。从填充测试单元获取的知识是不够的。最终证据来自全规模现场测试。但这是另一个故事。 “工程的喜乐是在双对数图中找到一条直线”,卡尔斯鲁厄大学(德国)托马斯科纳格州。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号