During the inspection of a 1 km-long twin road bridge with longitudinal prestressing, corroded and broken tendon wires were detected by chance. Further investigations showed that the corrosion had been induced by de-icing salts, which reached the girder through water-bearing aeration tubes and a leaking drainage system.
展开▼