首页> 外文会议>Society of Petroleum Engineers Hydraulic Fracturing Technology Conference >Multiple Transverse Fracturing in Open Hole Allows Development of a Low Permeability Reservoir in the Foukanda Field,Offshore Congo
【24h】

Multiple Transverse Fracturing in Open Hole Allows Development of a Low Permeability Reservoir in the Foukanda Field,Offshore Congo

机译:开孔中的多个横向压裂允许在刚果Foukanda领域的低渗透水库开发出现低渗透水库

获取原文

摘要

During the past decade,multiple transverse fracturing in horizontal wells has been applied so successfully in onshore low- permeability reservoirs that it is becoming the standard completion practice in many areas.The reasons for the success of this technique vary,but the two main reasons are related to the undisputed effectiveness of hydraulic fracturing as a production enhancement technique and the relatively low cost of pumping services in onshore areas.Success and industry eagerness for process/cost optimization have contributed to many technological improvements in the multistage completion process allowing sequentially executing several fracturing treatments in a single pumping operation.Nevertheless,the high direct and indirect costs and the risks associated with offshore operations have traditionally been limiting factors in spreading this technology to offshore applications.Sometimes,the misplaced perception of hydraulic fracturing as risky and costly operation prevented,rather than encouraged,its application in marginal offshore oilfields.Recent increases in oil prices and the success in onshore applications have encouraged the use of hydraulic fracturing in offshore applications.This study documents the successful effort of taking these techniques to the offshore environment.Transverse fracturing with multistage completion concept- with properly engineered design of well trajectory-can make the difference between the economic success or failure in the field development of low-permeability reservoirs.This study used multidisciplinary and integrated approach to design and execute the treatments,involving reservoir,production optimization,and fracturing engineers from the early stages of well planning to construction.The multilayer Foukanda field,located 52km offshore from Pointe Noire,Congo,has a low permeability and virgin target that was considered noncommercial after discouraging results of two wells.Based on the production results of three cased-hole wells in an analogous field where multiple propped fracturing was applied,the operator decided to drill an open-hole horizontal well that was to be multi-fractured.The initial 90 days average production of this Foukanda well was more than 2500bbl/day.This production rate was double the simulated rate of a vertical well and opened a wide range of further developments both in Foukanda and in other analogue fields in the offshore Congo.
机译:在过去十年中,在陆上低渗透水库中已经成功地应用了多个横向压裂,即它正在成为许多领域的标准完成实践。该技术成功的原因各不相同,但两种主要原因是与液压压裂作为生产增强技术的无可争议的有效性相关,陆上地区的泵送服务成本相对较低。过程/成本优化的渴望和行业渴望为多级完成过程中的许多技术改进造成了允许顺序执行多个压裂的贡献在单一抽水操作中的治疗方法。最高的直接和间接成本以及与海上业务相关的风险传统上是将该技术传播到海上应用的因素。模糊的是,防止液压压裂的错位感受,防止了液压压裂, rathe. r比鼓励其在边缘近海油田的应用。石油价格上涨,岸上应用的成功鼓励在海上申请中使用液压压裂。本研究文件将这些技术带到海上环境中的成功努力。翻译压裂随着多级完成概念 - 具有良好的工程设计的井展设计 - 可以在低渗透水库的田间开发中的经济成功或失败之间进行差异。本研究使用了多学科和综合方法来设计和执行治疗,涉及水库,涉及水库,生产优化,以及从计划井的早期阶段进行建设的裂缝工程师。多层Foukanda田野,刚果刚果的Pointe Noire 52公里海上,具有低渗透性和处女靶,在劝阻两个井的结果后被认为是非商业的。基于三个套管的生产结果我们LLS在应用多个丙位压裂的类似领域,操作员决定钻孔水平井,这是多裂缝的。初始90天的这一Foukanda井的产量超过2500bl /天。本生产速度是垂直井的模拟速率的加倍,并在离岸刚果的其他模拟领域开辟了广泛的进一步发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号