首页> 外文会议>Rocky Mountain (RM) Oil and Gas Technology Symposium >Optimization of a Scale Treatment in the Uinta Basin—A Case History
【24h】

Optimization of a Scale Treatment in the Uinta Basin—A Case History

机译:uinta盆地中规模治疗的优化 - 案例历史

获取原文

摘要

The precipitation and accumulation of scale deposits is a major concern for production companies in the Uinta Basin. Since 2003, conventional hydraulic fracturing treatments with scale inhibitor pumped simultaneously as an additive have been offered to this region. This service proved to be very effective in the Permian Basin using borate crosslinked fracturing treatments (with scale inhibitor concentrations as low as 5 gal/mgal). However, these design criteria and formulation of the scale treatments had to be changed significantly to be effective in the typical Uinta Basin gas well environment: low permeability (<0.1 md), multi-layered, commingled gas reservoirs. Typically, a well completed and placed on production without any scale inhibitor in the Uinta Basin may show signs of scale buildup in as little as 30 days. The effects of the scale accumulation can be seen everywhere from an exaggerated production decline to scale deposition on production equipment. This paper outlines the learning procedure and present designs, testing and monitoring results from scale treatments together with a case study from the Uinta Basin.
机译:规模沉积物的降水和积累是Uinta盆地生产公司的主要问题。自2003年以来,已经向该区域提供了与添加剂一起泵送的常规液压压裂处理。该服务在二叠纪盆地中证明是非常有效的,使用硼酸盐交联压裂治疗(抑制抑制剂浓度低至5AL / MGAL)。然而,这些设计标准和制定规模治疗必须在典型的Uinta盆地气井环境中显着变化,以便有效:低渗透率(<0.1md),多层混合气体储层。通常,在不含Uinta盆地中没有任何抑制剂的生产良好的生产,可以显示出在短短30天内的规模累积迹象。可以从夸张的生产下降到生产设备上的沉积沉积来看尺度积累的影响。本文概述了学习程序和目前的设计,从uinta盆地的案例研究中的规模治疗。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号