首页> 外文会议>SPE Latin American and Caribbean Petroleum Engineering Conference >Engineered Fiber-Based Loss Circulation Control Pills To Successfully Combat Severe Loss Circulation Challenges During Drilling and Casing Cementing in Northern Pakistan
【24h】

Engineered Fiber-Based Loss Circulation Control Pills To Successfully Combat Severe Loss Circulation Challenges During Drilling and Casing Cementing in Northern Pakistan

机译:基于工程的纤维损失循环控制丸在巴基斯坦北部钻井和套管固井期间成功地打击严重的损失循环挑战

获取原文
获取外文期刊封面目录资料

摘要

Loss circulation is the biggest challenge after drilling and weather-related problems during the process of constructing new wellbores.As per industry figures,more than USD 2 billion per year are spent in combating losses.In the Kohat-Potwar plateau of the Upper Indus basin of northern Pakistan,a harsh and complex environment,a well usually takes anywhere from 180 to 270 days to drill.The overall time taken to drill depends on the formation thicknesses,severity of the losses,and the concession location within northern Pakistan. High-pressure water zones are located close to salt and shale formations,above the potential reservoirs. While drilling through the high-pressure formations,high mud weights greater than 1980 kg/m3(16.5 lbm/gal)are required to maintain a well under control,which often leads to induced losses during drilling and also while running casing.The mud weight is typically lowered to 1500 kg/m3(12.5 lbm/gal)or lighter to combat massive losses in naturally fractured limestone formations in the production hole. Engineered fiber-based loss circulation(EFBLC)control pills,based on a specially engineered fiber system and the particle size distribution principle,were developed to control the losses.The pills were effective in curing losses during drilling and while cementing;prior to the introduction of the EFBLC pills,operators spent days in combating losses with numerous traditional methods.Also,the pills were robust enough to work in water-base mud(WBM),oil-base mud(OBM),or synthetic-base mud(SBM) environments with weights up to 2040 kg/m3(17.0 lbm/gal). In applications in northern Pakistan,the EFBLC pills were successful in combating the losses while drilling and cementing,thus reducing the threat of nonproductive time(NPT);minimizing the quality, health,safety and environmental(QHSE)concerns of well control;and preventing costly remedial jobs due to poor zonal isolation.
机译:损失循环是建造新Wellbores的钻井和与天气相关问题之后的最大挑战。每个行业数据,每年超过20亿美元用于打击损失。在梧桐盆地的Kohat-Potwar高原在巴基斯坦北部,环境中的苛刻和复杂的环境中,通常需要180到270天的任何地方钻取。钻头的总体时间取决于北巴基斯坦北部的形成厚度,损失的严重程度。高压水区位于潜在水库上方靠近盐和页岩形成层。在钻孔通过高压形成时,需要大于1980kg / m3的高泥浆重量(16.5LBm / gal)来维持良好的控制,这通常导致钻井过程中的损失,而且在运行壳体时也会导致损失。泥浆重量通常降至1500kg / m3(12.5LBm / gal)或更轻,以对生产孔的天然裂缝的石灰石形成中的大量损失作出巨大的损失。基于工程的纤维损失循环(EFBLC)控制丸,基于特殊的设计光纤系统和粒度分布原理,以控制损失。药丸在钻井期间造成损失和胶结的同时;在引言之前在efblc丸中,操作员在对抗许多传统方法中的损失时花了几天。ALSO,丸剂足以在水基泥浆(WBM),油基泥浆(OBM)或合成基础泥浆(SBM)中工作。具有高达2040 kg / m3的重量的环境(17.0 lbm / gal)。在巴基斯坦北部的应用中,EFBLC药丸在钻井和巩固时成功地打击损失,从而减少了非培养时间(NPT)的威胁;最大限度地减少了良好控制的质量,健康,安全和环境(QHSE)的担忧;和预防由于区域差别差,昂贵的补救职位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号