首页> 外文会议>SPE Latin American and Caribbean Petroleum Engineering Conference >Successful Polymer Gels Application in a Highly Channeled Peripheral In-jection Well:Tello Field Pilot
【24h】

Successful Polymer Gels Application in a Highly Channeled Peripheral In-jection Well:Tello Field Pilot

机译:成功的聚合物凝胶在高度通道的外围互联网上应用:Tello Field Pilot

获取原文

摘要

Tello Field is operated by ECOPETROL S.A.and located in the Upper Magdalena Valley Basin, Colombia.It began production in 1972 and reached a maximum primary rate of 11,200 BOPD in 1980. A peripheral water injection process started in 1997,reaching a maximum secondary production of 15, 552 BOPD in 2000.From this date,water production has increased due to an unfavorable mobility ratio (M 3.5)and a high permeability contrast(Dykstra-Parson coefficient:0.8-0.9).The current recovery factor is 22%and water cut is 92%. This paper summarizes from the laboratory to the field evaluation of a successful polymer gel project for controlling water thief zones,implemented as a strategy to reduce the phenomenon of channeling identified between the injection well Te-49 and the producer well Te-46.The design includes laboratory test(fluid–fluid,fluid–rock and cinetic reaction)to determine the right polymer and the necessary polymer and crosslinker concentration to obtain consistency of the gel at the reservoir conditions. Polymer gel injection began in October 2009,reaching 43,400 bbl of solution injected(13%of channel volume)and being the largest Latinoamerican polymer gel treatment until now.Injection strategy considered a maximal polymer concentration of 7000 ppm and a fixed polymer/crosslinker ratio ranging from 40:1 to control maximum injection pressure.Field results showed an important increase in oil recoveries(oil production up to 300%)and a reduction in water cut(3%).Comparing these results to what is normal obtained with this technology this is one of the most efficient process until now,this is more relevant when taking into account the peripheral condition of the water injection. This work led to design and implement processes for water injection channeling control to improve the efficiency of water injection into other areas of the Tello field and other Colombian fields.
机译:Tello Field由位于哥伦比亚山谷山谷盆地山谷盆地的Ecopetrol Saand来运营。它于1972年开始生产,并于1980年开始生产11,200个Bopd。1997年开始的外围注水过程,达到了最大的二级生产15,552 Bopd 2000年。从本日期,由于不利的迁移率(M 3.5)和高渗透率对比(Dykstra-Parson系数:0.8-0.9),水产量增加。目前的恢复因子是22%和水切割为92%。本文总结了实验室对控制水小偷区的成功聚合物凝胶项目的实地评价,实施作为减少注射孔TE-49和生产者井TE-46之间鉴定的信道现象的策略。设计包括实验室测试(流体流体,流体摇滚和致态反应),以确定正确的聚合物和必要的聚合物和交联剂浓度,以获得储层条件下凝胶的一致性。聚合物凝胶注射始于2009年10月,达到43,400磅的溶液(13%的通道体积),直到现在直到现在的LatinoIne甲酰聚合物凝胶处理。注意到造影策略被认为是7000ppm的最大聚合物浓度和固定聚合物/交联剂比率测距从40:1控制最大注射压力。菲尔德结果显示出油回收率的重要增加(产量高达300%),降低水切口(3%)。将这些结果与本技术的正常价格进行比较是现在,这是最有效的过程之一,考虑到注水的外周条件时,这更相关。这项工作导致设计和实施水注射渠道控制的工艺,以提高水注射效率进入特罗田和其他哥伦比亚领域的其他地区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号