首页> 外文会议>SPE Latin American and Caribbean Petroleum Engineering Conference >Drawdown Management:A Technical and Economic Alternative for Sand Control in Wells:A Colombian Field Application
【24h】

Drawdown Management:A Technical and Economic Alternative for Sand Control in Wells:A Colombian Field Application

机译:奖励管理:井中的防砂技术和经济替代品:哥伦比亚领域应用

获取原文

摘要

One of the most common problems during the hydrocarbon production is sand production.Efficient control of the sand production without causing formation damage will depend on the knowledge that we have of the reservoir and also of the designs and estimates that we make during the drilling,completion and production.Sand production causes many problems ranging from collapses in casing,failures of subsurface equipment and surface facilities and accumulation in downhole generating continuous inter-ventions,up to the point of making unproductive wells,thus putting in risk the future interventions of the wells and the capacity thereof in the long term. In the oil industry there is a diverse range of technologies to control and/or exclusion of sand in open hole and/or case hole that can be mechanicals or chemicals,but the selection must be done carefully, taking into account granulometric and mineralogical criteria for proper selection,because although that we choose the best alternative technique and do a good sand control,the solution may not be optimal from the economic standpoint. A good decision making process considers other alternatives for sand control,such as handling the drawdown pressure,which in some cases proves to be a technical and economic alternative,especially when the critical drawdown pressure(CDP)presents values over 40%of the reservoir pressure. A geomechanics evaluation establishes the predictive model of sand production,which allows us to determine the critical drawdown Pressure.From density logs,Vsh,sonic logs,etc.and correlations,the compressive strength(UCS),cohesion,angle of internal friction and mechanical properties of the rock (Young modulus,Poisson’s ratio,etc.)are determined.With a geomechanical model(previously selected and evaluated with field and laboratory data),the pressure gradient and the mechanical properties of the rock,the predictive model of sand production is established. This study was conducted in the fields:Lisama,Galán,Llanito,Yarigui,Cantagallo and Bonanza in Colombia.This article presents the case study in the well Lisama 166,where the drawdown management became a technical and economic alternative for sand control.
机译:碳氢化合物生产中最常见的问题之一是砂生产。砂生产的低效控制而不会导致形成损伤,取决于我们对水库以及我们在钻井期间制作的设计和估计的知识,这将取决于我们在钻井期间制作的设计和估计和生产。和生产导致套管中的坍塌,地下设备的故障以及井下的倒塌产生持续渠道的倒塌的问题,直至制造不良井,从而冒着井的未来干预措施和长期的能力。在石油工业中,有多样的技术来控制和/或排除可以是机械或化学物质的开孔和/或壳体孔,但必须仔细完成选择,考虑到粒状和矿物学标准适当的选择,因为虽然我们选择了最佳替代技术并进行了良好的砂控制,但解决方案可能不是从经济的角度最佳的。一个良好的决策过程考虑了砂控制的其他替代方案,例如处理降压压力,这在某些情况下被证明是一种技术和经济替代方案,特别是当关键拔压压力(CDP)呈现超过40%的储层压力时。地质力学评估建立了砂生产的预测模型,这使我们可以确定临界缩小压力。密度日志,vsh,声音日志等和相关性,压缩强度(UCS),内聚力,内部摩擦角和机械角度确定了岩石(幼年模量,泊松比等)的性质。在地质力学模型(先前选择和评估和实验室数据),压力梯度和岩石的机械性能,砂生产的预测模型成立。该研究在田野中进行:丽莎,加拉恩,兰提托,Yarigui,坎塔尼亚和富士扎诺州在哥伦比亚。这篇文章在Lisama 166中提出了案例研究,其中绘图管理成为防抱道的技术和经济替代品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号