首页> 外文会议>SPE Latin American and Caribbean Petroleum Engineering Conference >PCP Run Life Improvement in Orinoco Belt With New PCP Technology
【24h】

PCP Run Life Improvement in Orinoco Belt With New PCP Technology

机译:PCP在新的PCP技术中运行奥里诺科腰带的生活改进

获取原文

摘要

In 1997,the commercial development of the large Heavy&Extra Heavy Oil(HO&EHO)resources of the Orinoco Belt(7 to 12°API/Estimated 295 Bbbl of Recoverable Crude Oil)was initiated.The SINCOR Project(SINcrudo ORiente–then a JV between Total,Statoil&PDVSA),now operated by Petrocede?o JV,was the first of its kind in the area,and until today it is considered as a reference when it comes to developing the most recently allocated blocks in the area. After more than 10 years of intensive production programs,some fields are showing signs of depletion and associated production of gas is increasing.PCM,who is involved in supplying Progressing Cavity Pumps technologies to the Orinoco belt since the very beginning,has developed the exclusive&patented HR-PCP(Hydraulically regulated PCP)technology in order to extend run life of the conventional PCPs in these fields where ALPCP systems’Mean Time Between Failure(MTBF)has shown sharp decrease in the last few years. In 2011,a project was launched in collaboration with Petrocede?o optimization department in order to validate HRPCP technology in this field.2 115E1600 HRPCP pumps were installed in XA07&YA02 selected wells.The wells selections criteria were: Wells with high gas production&high estimated GVF Short pumps run life Following the study of Progressing Cavity Pump Technology’s behavior in Multiphase conditions (SPE95272),the subsequent development of the“New PCP”(SPE 97833),and the example of the first commercial and large scale deployment in Argentina(SPE 152228),this paper shows how the HRPCP Technology benefits to the specific Orinoco Belt environment,and what this technology could bring to further development of this heavy oil basin.
机译:1997年,启动了奥林科带的大型重和额外重油(HO和EHO)资源的商业开发(7至12°API /估计的可回收原油)。诚意项目(Sincrudo Oriente-Then Thel Total之间的JV现在由Petrocedede运营的Statoil&PDVSA)是该地区的第一个,直到今天它被视为在开发该地区最近分配的块时的参考。经过10多年的密集生产计划后,一些领域呈现出耗竭和有关的天然气生产的迹象.PCM,涉及自最初开始以来向奥林科带提供进展腔泵技术,开发了独家专利的人力资源-PCP(液压调节的PCP)技术为了在这些领域中延长传统PCP的运行寿命,其中ALPCP系统在故障(MTBF)之间的时间(MTBF)在过去几年中显示出急剧下降。 2011年,一项项目与Petrocede合作启动?O优化部门,以验证HRPCP技术在本领域.2 115E1600 HRPCP泵安装在XA07&Ya02精选的井中。井选择标准是:高气体生产和高估计的GVF短井在进行腔泵技术的研究中的多相条件下的行为(SPE95272)中,随后开发“新型PCP”(SPE 97833),以及阿根廷第一次商业和大规模部署的示例后,(SPE 152228) ,本文展示了HRPCP技术如何对特定的奥里诺科皮带环境有益,以及这项技术可以进一步发展这种重油盆地。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号