Eskom's New Coal-Fired Power Stations Programme Case of Bravo Power Station Scheme: Transmission Integration (Feasibility study)

机译:ESKOM新的燃煤发电站计划案例Bravo发电站方案:传输集成(可行性研究)

获取原文

摘要

In order to meet South Africa's future electricity demand, Eskom has initiated a process to evaluate the feasibility of various power generation options. Coal fired generating options are envisaged to remain a fundamental part of South Africa's power generation options. ISEP (Integrated Strategic Electricity Planning) indicated that new base load power generation will be required no later than 2011 to accommodate expected future loads. Eskom Transmission Investment Committee was thus requested to issue a budget cost estimate for the transmission infrastructure required to integrate Bravo Power Station Scheme into the Eskom Transmission network. To derive the required cost estimate, a feasibility study was to be done. Bravo Power Station Scheme will be located about 15km North of Kendal Power Station in the Eskom generation pool. It is expected that Bravo would consist of either 4200MW or 5400MW generating capacity; i.e. 6×700MW units or 6×900MW units. This paper will present results of the study that was done to determine the optimal transmission integration proposal. Loadflow and transient stability studies were done to assess network constraints. Options were studied to remove constraints where they exist while responding to the objective of power evacuation into the grid.
机译:为了满足南非未来的电力需求,ESKOM已启动一个评估各种发电选项的可行性的过程。设想煤炭发电选项,仍然是南非的发电选项的基本部分。 ISEP(综合战略电力规划)表示,新的基本负荷发电将不迟于2011年来适应预期的未来负荷。因此,已要求ESKOM传输投资委员会为将Bravo发电站方案集成到ESKom传输网络所需的传输基础设施进行预算费用估算。为了获得所需的成本估算,将进行可行性研究。 Bravo Power Station Scheme将位于ESKOM发电厂的Kendal Power Station北部约15公里。预计Bravo将包括4200MW或5400MW的产生能力;即6×700MW单位或6×900MW单位。本文将呈现研究的结果,以确定最佳传输整合提案。可以进行负载流和瞬态稳定性研究以评估网络限制。研究了选项以删除它们在响应电力疏散到网格中的目标的同时存在的约束。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号