【24h】

Implementation of ROP Management Process in Qatar North Field

机译:卡塔尔北方地区ROP管理过程的实施

获取原文
获取外文期刊封面目录资料

摘要

In March 2005, the operator implemented a rate of penetration (ROP) management process in Qatar's North Field. IPTC Paper 10706-PP describes the general principles behind the new work process and highlights its introduction to the operator. The ROP management process uses real time, customized surveillance technology to continuously maximize both drill bit cutter efficiency and transmission of energy from rig floor to the bit. This paper focuses on specific changes in drilling practices and their translation into substantive program acceleration and capital savings. To date, the development program has been accelerated by one year and USD 54 million has been saved while drilling 470,000 ft of hole. The process has proven to be a highly effective solution for management of drilling efficiency in a major development drilling campaign. As an indicator of program scope and effectiveness, over 440 personnel have been trained in mechanical specific energy (MSE) analysis, and 50 new field drilling records have been set by the nine rigs involved in the program. Importantly, the process has been implemented with one of the best safety records in industry (TRIR or total recordable incident rate of 0.11 per 200,000 man-hours as of September 06).
机译:2005年3月,运营商在卡塔尔北方领域实施了渗透率(ROP)管理进程。 IPTC文件10706-PP描述了新工作过程背后的一般原则,并突出了其对运营商的介绍。 ROP Management Process使用实时定制监控技术,以连续地最大化钻头刀具效率和从钻机底部的能量传输到钻头。本文侧重于钻井实践及其翻译成实质性方案加速和资本储蓄的具体变化。迄今为止,发展方案已加快一年,并在钻孔470,000英尺的孔时挽救了5400万美元。该过程已被证明是对主要开发钻探活动中的钻井效率管理的高效解决方案。作为方案范围和有效性的指标,超过440人的人员在机械特定能量(MSE)分析中受过培训,并且涉及该计划的九台钻机已经设定了50个新的钻井记录。重要的是,该过程已通过行业最佳安全记录之一(TRIR或总可记录的事件率为0.10截至9月6日)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号