首页> 外文会议>International Association of Drilling Contractors and Society of Petroleum Engineers Drilling Conference and Exhibition >Integrated Drilling Optimization and Downhole Drilling Dynamics Enables PDC Bits to Drill in the Colorado Region of the San Juan Unconventional Gas Basin
【24h】

Integrated Drilling Optimization and Downhole Drilling Dynamics Enables PDC Bits to Drill in the Colorado Region of the San Juan Unconventional Gas Basin

机译:综合钻井优化和井下钻探动力学使PDC位能够在圣胡安非传统气体盆地的科罗拉多地区进行钻孔

获取原文

摘要

The San Juan basin is a prolific natural gas play in northwestern New Mexico and southwestern Colorado. For more than four years, all attempts to find a poly crystalline diamond compact (PDC) solution for the northern part of the basin have been unsuccessful or uneconomic; in addition, the performance of insert bits had also reached a plateau of roughly 60 ft/hr. In order to achieve the next step change in drilling performance, it was decided that a drilling optimization process that was integrated with high speed downhole drilling dynamics was required. The optimization process required the cooperation of the client, the directional drilling company, and the optimization company. The team was challenged to find a fixed cutter solution that could drill from surface to total depth (TD) in one run and at over 100 ft/hr; these challenges thus became the project’s two primary objectives. This paper discusses how an optimization process was integrated with high speed, multiple placement, downhole drilling dynamics analysis in order to discover what was limiting the performance of fixed cutter bits. The process involved four phases - analysis, planning, execution, and evaluation - utilizing a four well project. The lessons learned from each well were then applied to the next well in the sequence. From the lessons learned, small changes were made to the drilling assembly after each well in the sequence. These changes were then analyzed on the subsequent well. On each section, the downhole drilling dynamics data was merged with surface data. The analysis of this data demonstrated that the main limiters to drilling performance were poor weight transfer and vibration. On the fourth well in the sequence, a specially designed, six bladed fixed cutter PDC bit drilled the entire 2,858ft of the 7 7/8” section, in one run. The overall rate of penetration (ROP) including connection time, was 102 ft/hr, surpassing the goal of 100 ft/hr.
机译:圣胡安盆地是新墨西哥州西北部和科罗拉多州西南部的多产天然气。四年以上,所有试图找到盆地北部北部的聚结晶金刚石压缩(PDC)解决方案都是不成功或不经济的;此外,插入位的性能也达到了大约60英尺/小时的平台。为了实现钻孔性能的下一步变化,决定需要与高速井下钻井动态集成的钻井优化过程。优化过程要求客户,定向钻探公司和优化公司的合作。该团队被挑战找到一个固定的刀具解决方案,可以在一次运行和超过100英尺/小时内从表面钻取到总深度(TD);因此,这些挑战成为项目的两个主要目标。本文讨论了如何以高速,多重放置,井下钻探动力学分析集成了优化过程,以便发现限制固定刀头的性能。该过程涉及四个阶段 - 分析,规划,执行和评估 - 利用四个井项目。然后在序列中将从每个孔中学到的经验教训。从经验教训中,在序列中每个孔后对钻井组件进行小的变化。然后在随后的井上分析这些变化。在每个部分上,井下钻探动力学数据与表面数据合并。对该数据的分析表明,钻井性能的主要限制性较差,重量差和振动。在序列中的第四个井中,一个专门设计的六个叶片固定刀具PDC位钻了7个7/8“部分的整个2,858英尺,一次运行。包括连接时间的总体渗透率(ROP)为102英尺/小时,超过100英尺/小时的目标。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号