首页> 外文会议>Steel Constrction Conference >ERECTION OF THE BURRO CREEK BRIDGE
【24h】

ERECTION OF THE BURRO CREEK BRIDGE

机译:武装溪桥架的勃起

获取原文

摘要

Construction methods for arch bridges have been around for centuries but the advancement of modern technology and the need for lower costs has taken the construction of the arch to new heights. Today's competitive market requires contractors to be innovative in how they approach a project. The contractor needs to use all competitive advantages during the bid process. Contractors cannot and should not depend on the schemes depicted in the contract drawings as the most cost effective method to construct the project. They need to be creative, innovative and deploy innovative technology. The intent of this paper is to provide an overview of the development of the erection scheme of the 700' steel arch truss located in Wikieup, Arizona.
机译:拱桥的施工方法已经存在了几个世纪,但现代技术的进步以及降低成本的需求已经将弓形建造到新的高度。今天的竞争市场需要承包商在他们接近项目的创新方面是创新的。承包商需要在出价过程中使用所有竞争优势。承包商不能且不应依赖合同图纸所描述的计划作为构建项目的最具成本效益的方法。他们需要创造性,创新和部署的创新技术。本文的目的是提供位于亚利桑那州Wikieup的700'钢拱桁架的勃起方案的开发概述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号