首页> 外文会议>SPE Annual Technical Conference and Exhibition >A Paradigm Shift in Drilling Frac Plugs in Extended Laterals-A PermianBasin Case History
【24h】

A Paradigm Shift in Drilling Frac Plugs in Extended Laterals-A PermianBasin Case History

机译:延长横向钻井间钻孔插头的范式转换 - 超级禁止案例历史

获取原文

摘要

Wells in the Permian Basin continue to increase in technical complexity and lateral length,testing the limitsof traditional completion practices in unconventional wells.Coiled tubing has been the standard methodfor drilling out frac plugs in the basin but has mechanical limitations in extended-reach and high-pressurelaterals.Due to the increasing well complexity operators have begun using high technology hydrauliccompletion units(HCU),also known as a snubbing unit,to drill out frac plugs in certain Permian Basin wells.By using the HCU in wells with longer laterals,higher pressures,and downhole uncertainty/complexitysome of the additional risk can be mitigated.The HCU system can provide a reliable and cost-effectivemeans to cleanout laterals in the Permian Basin while reducing mechanical risk.The purpose of this paperis to present case histories that illustrate the positive impact of the HCU on field operations.This paper willalso detail the evolution of the HCU over time to its current state of the art stand-alone rigless system.
机译:井中的井继续增加技术复杂性和横向长度,测试传统的完整实践在非传统的井中的限制.Coiled管道是钻出盆地的Frac插头的标准方法,但在延长率和高度方面具有机械限制压力线延长井的复杂性运营商已经开始使用高科技液压计算单元(HCU),也称为怠慢单元,以便在某些二叠系盆井中钻出Frac插头。使用HCU的井中较长,压力更高并且可以减轻额外风险的井下不确定度/复杂性。HCU系统可以提供可靠的和成本的成本,以便在二叠系盆地中清理旁观者,同时降低机械风险。本文的目的是呈现出阳性的病例历史HCU对现场运作的影响。本文将随着时间的推移细节HCU的演变最先进的独立严格系统。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号