首页> 外文会议>SPE Annual Technical Conference and Exhibition >Single Trip Tubing Conveyed Perforations Across Multi-Lobed DifferentiallyDepleted Reservoir Complexes in a Highly Deviated Well-Challenges,Lessons Learned and Best Practices
【24h】

Single Trip Tubing Conveyed Perforations Across Multi-Lobed DifferentiallyDepleted Reservoir Complexes in a Highly Deviated Well-Challenges,Lessons Learned and Best Practices

机译:单程管道在高度偏离的挑战中,经过高度偏离的挑战,经验教训和最佳实践,单行管

获取原文

摘要

This paper demonstrates how 280ft of oil column spread unevenly across multiple and differentially depletedreservoir units separated by shale layers of varying thicknesses in a highly deviated(62 deg.)well wasperforated in a one trip system and how the project cost was minimized by achieving multiple perforations ina single trip whilst retaining capacity to effectively cure losses and mitigating post-perforation well controlrisks.Against the conventional perforation methodology where reservoir units are perforated individually,isolated before carrying out the next perforation in the subsequent reservoir.The one trip system wasdesigned and deployed in one run targeting all the 6 separate carefully selected sand lobes in one run ensuringgood standoff from the contact and zonal isolation behind casing.Successful execution was confirmedwith all the expected physical outcomes which includes pipe vibration,brine loss as well as inspection ofthe spent guns.A post perforation noise and production logging also confirmed flow across all plannedperforation intervals.Perforation of a highly deviated well in differentially depleted multi-lobed reservoirspresent significant operational risks.This paper illustrates how one can safely collapse multiple conventionalperforation runs into a single trip with its attendant benefits on cost efficiency,crossflow and well control.This is the first of its kind in the Niger Delta.
机译:本文展示了280英尺的油柱跨越多个和差分脱模的型单位的油柱,在高度偏差(62°C)中,在一个跳闸系统中的高度偏差(62°C)中的不同厚度分开的厚度分开的多个和差异脱模的单位。通过实现多种穿孔,如何最小化项目成本。 INA单行程,虽然保持能力有效治疗损失和减轻后穿孔后井控制器。储存器单位在随后的水库中的下一个穿孔之前单独穿孔的传统穿孔方法。一跳和部署在进行储存器单元的传统穿孔方法。一跳和部署在进行储存装置的常规穿孔方法。一个人在一个运行中瞄准所有6个独立的仔细选定的沙叶,确保了从套管后面的接触和区域隔离的俯视。已经确认了所有预期的物理成果,包括管道振动,盐水损失以及花费枪支的检查.a穿孔后噪音和产品离子测井还确认了所有捐赠的间隔的流程。在差异耗尽的多裂储层预测的重大操作风险中,高度偏差的经济性。本文说明了如何安全地折叠多种常规的术语,其中伴随着成本效率的服务员效益, Crossflow和Control.This是尼日尔三角洲的第一个。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号