首页> 外文会议>SPE Annual Technical Conference and Exhibition >Mangala Well and Reservoir Mangement: The Journey to 150,000bopd
【24h】

Mangala Well and Reservoir Mangement: The Journey to 150,000bopd

机译:曼加拉井和水库管理:150,000bold旅程

获取原文

摘要

The Mangala field in the Rajasthan state of western India was the first major oil discovery in the Barmer Basin having a STOIIP of over 1.3 billion barrels in multiple stacked fluvial clastic reservoirs. It contains medium gravity (20-28°API), waxy, viscous crude (9-17 cp) in high permeability (1-25 Darcy) clean sandstone reservoirs. Mangala field is on production since 2009 and is currently producing at 150k bopd. The field has a comprehensive reservoir Management plan (RMP). As per the RMP, an active reservoir surveillance plan of data acquisition and analysis is being continuously executed in the field. The key data acquisition included Pressure surveys, Production and injection logging, well and network modeling, Reservoir saturation logging, Interference testing, well & artificial lift parameters. Several challenges and production and injection problems were identified and were addressed in a step wise manner. The well and reservoir performance for ~ 2 years suggested higher production capacity. Detailed well modeling and surface network modeling was carried out and it was seen that after the installation of Artificial lift, the ongoing production enhancement efforts, continuous reservoir surveillance and management, the field had capacity to produce at a plateau rate of 150k bopd. Simulation studies suggested no detrimental effects on the ultimate recovery. The plateau rate of the field was increased from approved FDP rate of 125k to 150k bopd, after due approvals and the field has been producing at this rate since April 2012. This paper presents the summary of: 1.? Data acquired during the production phase of 125k bopd 2.? Major problems identified in the field and there mitigation 3.? Well and Network Modeling Study 4.? History of field post plateau rates of 150k bopd. 5.? Challenges being faced to maintain 150k bopd.
机译:印度西部拉贾斯坦邦的曼加拉领域是培训盆地的第一个主要的石油发现,该盆地在多个堆叠的河流泥浆储层中具有超过13亿桶的STOIIP。它含有中等重力(20-28°API),蜡质,粘性原油(9-17CP),高渗透率(1-25达西)清洁砂岩储层。自2009年以来,曼加拉领域正在生产,目前正在达到150K Bopd。该领域拥有全面的水库管理计划(RMP)。根据RMP,在现场持续执行数据采集和分析的主动储层监控计划。关键数据采集包括压力调查,生产和注入测井,井和网络建模,水库饱和度测井,干扰测试,井和人工升力参数。确定了几种挑战和生产和注射问题,并以一步之明的方式解决。 〜2年的井和水库表现提出了更高的生产能力。进行了详细的井建模和表面网络建模,并看来,在安装人工升降机后,持续的生产增强努力,连续水库监控和管理,该领域的能力以150k博科的高原生产。仿真研究表明对最终恢复没有不利影响。在适当批准后,该领域的高原率从批准的FDP率增加到125K至150K Bopd,该领域自2012年4月以来一直在此次生产。本文提出了以下摘要:1。?在125K BOPD 2.的生产阶段获得的数据在现场确定的主要问题和减缓3.?以及网络建模研究4.?现场历史150K BOPD的高原率。 5.挑战需要维持150k博克。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号