首页> 外文会议>SPE Annual Technical Conference and Exhibition >First Dual Zone Drillstem Test With Acoustic Telemetry Using Multiple Retrievable Packers for Single Trip Testing of Two Independent Reservoirs
【24h】

First Dual Zone Drillstem Test With Acoustic Telemetry Using Multiple Retrievable Packers for Single Trip Testing of Two Independent Reservoirs

机译:使用多个可检索式封装机进行声学遥测的第一双区域钻机测试,用于两个独立水库的单程测试

获取原文

摘要

Although the main objectives of drillstem testing (DST) have remained largely unchanged over the years, operators are continuously seeking a means of improving operational efficiency (time/cost savings) while maintaining the highest level of operational standards, with safety and the environment being paramount. This paper presents a case history of the first retrievable dual packer testing string used to independently test two reservoirs in a single trip (toolstring conveyance into and out of the hole), which enhances operational efficiency. This case history is from an offshore exploratory well in Saudi Arabia in which a dual retrievable packer test string was deployed with a real-time telemetry system to successfully test two independent reservoirs in a single trip. Throughout the operation, real-tune telemetry data above and below each packer enabled real-time understanding of the operational process and provided assurance of equipment/process integrity before proceeding with the next sequence of well testing operations. In this manner, operations were safely performed step-by-step, ensuring that the well test objectives and zonal isolation were met to determine the individual reservoir evaluation integrity. With the application of acoustic telemetry technology, the ability to acoustically communicate with and control downhole tools in real time is achieved. Communication to and from the downhole tools also provides the status of the downhole equipment in real time. In addition, knowledge gained from the realtime data enhances the ability of the operators to perform well tests with reduced uncertainties. The early availability of reservoir knowledge enables operational efficiencies, ensuring that test objectives are met, and may reduce the overall test period and significantly reduce well testing costs. The direct result of eliminating multiple trips is that operational efficiency is achieved, enabling the operator to save time and money without compromising data quality or health, safety, and environment standards. This case history represents a milestone for the industry, demonstrating the successful deployment of multizone testing, and serves as a stepping stone for even greater efficiencies by using real-time telemetry technology. This paper also discusses lessons learned and plans for additional well testing process efficiencies, enhanced with well application selection and DST toolstring acoustic control devices and technology.
机译:虽然钻机测试(DST)的主要目标多年来一直保持不变,但运营商不断寻求提高运营效率(时间/成本节约)的手段,同时保持最高水平的运营标准,安全性和环境至关重要。本文提出了一种用于独立测试单行程(Toolstring Touching进出孔)中的两个储存器的第一个可检索的双封装器测试串的案例历史,这提高了操作效率。这种情况历史来自沙特阿拉伯的海上探索性井,其中使用实时遥测系统部署了双重可检索的包装机测试字符串,以在一次旅行中成功测试两个独立的水库。在整个操作中,每个包装器上方和下方的实际调整遥测数据都会启用对操作过程的实时了解,并在进行下一个井测试操作序列之前提供设备/过程完整性的保证。以这种方式,逐步地进行操作,确保满足井测试目标和区内隔离以确定个体储层评估完整性。随着声学遥测技术的应用,实现了在实时处理和控制井下工具的能力。往返于井下工具的通信还可以实时提供井下设备的状态。此外,从实时数据中获得的知识增强了运营商在减少不确定性的情况下执行井测试的能力。水库知识的早期可用性能够实现运营效率,确保满足测试目标,并可降低整体测试期并显着降低良好的测试成本。消除多次旅行的直接结果是实现运营效率,使操作员能够在不影响数据质量或健康,安全和环境标准的情况下节省时间和金额。这种情况历史代表了该行业的里程碑,证明了成功部署了多筒仓测试,并用作使用实时遥测技术的垫脚石,以实现更大的效率。本文还讨论了经验教训,并为额外的良好测试过程效率计划,增强了良好的应用选择和DST工具声控制装置和技术。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号