The Norddeutsche Affinerie operates an Outokumpu-Flash-Furnace as a smelting unit. The pyrometallurgical slag cleaning process is based on the slag reduction and settling in the electric furnace. Since 1972 when the slag cleaning furnace was built the throughput could be increased fourfold. However, an extensive optimisation effort is required in order to keep the copper loss low. A parameter study with a neuronal network model based on real process data was conducted to identify parameters impacting on the copper loss in the slag. It could be demonstrated that the main parameters responsible for copper loss in the final slag are fixed parameters of the flash furnace. For a better understanding of the copper loss in the electric furnace microscopic analyses of the slag structure and viscosity measurements were performed. Based on these results the reduction and settling of the copper containing droplets could be increased in both pilot plant studies and industrial scale. 4