Performance of Base Grouted Bored Piles in Specially Big Excavation Constructed Using Top-down Method

机译:基础灌浆钻孔桩在采用自上而下方法构建的特殊大挖掘

获取原文

摘要

The foundation pit of Zhongsheng Commercial Centre Building was constructed using top-down method. The one-pile-supporting-on-column mode was adopted in the foundation excavation and basement construction, which means a higher capacity of piles to sustain the total load imposed by the building structure and the temporary constructing loads. Base grouting technique was used improve the bearing capacity of the conventional bored piles that are usually constructed using bentonite slurry. In order to verify the effectiveness of base grouting, static load tests were conducted on three base grouted piles and three conventional bored piles, those of 48m long and embedded into sand. The load-settlements, distribution of the skin friction and pile toe resistance are presented and compared. By not only increasing the pile end bearing and the basal stiffness but also increasing the skin friction, base grouting significantly improved the overall performance of the pile.
机译:中华商业中心建筑的基坑采用自上而下的方法构建。基础挖掘和地下室建设采用单桩支撑柱模式,这意味着桩的容量较高,以维持由建筑物结构和临时构建负荷施加的总负荷。使用基础灌浆技术改善了通常使用膨润土浆料构建的传统钻孔堆的承载力。为了验证基础灌浆的有效性,在三个基地灌浆桩和三个传统的钻头桩上进行静载试验,长48米,嵌入沙子。呈现并比较了载荷沉降,皮肤摩擦和桩趾的分布。不仅增加了桩端轴承和基底刚度而且增加了皮肤摩擦,基础灌浆显着提高了桩的整体性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号