首页> 外文会议>Environmental Conference >Understanding EPA's Hazardous Waste Generator Improvements Rule
【24h】

Understanding EPA's Hazardous Waste Generator Improvements Rule

机译:了解EPA的危险废物发生器改进规则

获取原文

摘要

Are you positioned to successfully meet these new requirements, which vary from state to state? It's time to develop a plan now. The program amendments centered on improving efficiency entail a significant reorganization of the hazardous waste generator regulations, which have historically been confusing in their layout and configuration. Although the rule is scheduled to be effective May 30, 2017, that date will be inconsequential in most states. The RCRA hazardous waste generator regulatory program is primarily administered by each state, and therefore in all states (except Alaska, Iowa and the territory of Puerto Rico), the new requirements do not become effective until they are adopted by the-state's governing body. The earliest deadline for state adoption is July 2018. Additionally, authorized states are not required to adopt any amendments that are considered less stringent than existing regulations.
机译:您是否定位成功符合这些新要求,从州到州不同?现在是时候制定计划了。以提高效率为中心的计划修正案需要重新组织危险废物发生器规定,历史上一直在困惑的布局和配置。虽然该规则计划于2017年5月30日起生效,但该日期在大多数州时将是无关紧要的。 RCRA危险废物发电机监管计划主要由每个国家管理,因此在所有国家(阿拉斯加,爱荷华州和波多黎各领土除外),新的要求在国家的理论机构采用之前不会生效。国家采用的最早截止日期为2018年7月。此外,授权国家不需要采用任何被认为比现有规定不那么严格的修正案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号