Despite the Myth Engineers Can Put Things Back Together After Taking Them Apart: Repair of the Rotor Arm at Ohau A Power Station

机译:尽管神话工程师可以在接受它们之后将物品放回一起:在Ohau的转子臂修理一个电站

获取原文

摘要

Reliable, efficient, and available generating assets are key attributes that contribute towards the success of a generating company within the New Zealand energy market. Expectations from the market are high with respect to these key performance indicators and the cost of failure can be significant, especially in terms of lost revenue potential, Electricity Governance Rules compliance and company reputation. Asset owners are thus driven to ensure that asset management practices are optimised through the application of engineering process to ensure a timely and cost effective repair is implemented prior to any plant failure and that maintenance investment appropriately mitigates or removes the exposure of plant failure. Ohau A power station, commissioned in 1979/80, comprises of four hydro units with an installed capacity of 264 MW. During routine inspection of the generator in 1996 a crack was discovered in one of the rotor spider arms of Unit 5. In 2002 the defect was reported to have grown thus sparking concern of the unit's operational durability. Over the past three years the defects have grown in number and size. Routine monitoring has been used to track the cracks growth rate and projected time to failure. Engineering assessment, including finite element analysis, concluded that the defect could compromise the integrity of the generator, with the worst scenario resulting in extensive damage to the rotor and stator. This paper describes the complex task of replacing a rotor spider arm, an undertaking that far exceeds the normal routine maintenance carried out on a hydro generator. A synopsis of the rotor defects, condition monitoring and engineering assessment that led to the decision to repair the generator rotor are outlined. Moreover, the physical repair works are presented including removal of the rotor rim using induction heating, arm manufacture and replacement, to reassembly and commission. The work conducted highlights the benefits of routine engineering assessments and a proactive approach to asset management.
机译:可靠,高效,可用的发电资产是促进新西兰能源市场内发电公司成功的关键属性。市场上的期望与这些关键绩效指标相比很高,并且失败的成本可能是显着的,特别是在失去的收入潜力,电力治理规则合规和公司声誉方面。因此,资产业主被驱动,以确保通过应用工程过程进行优化资产管理实践,以确保在任何工厂故障之前及时和成本效益维修,并且维护投资适当减轻或消除植物失败的暴露。 Ohau一个发电站,1979/80年委托,包括四台水电装置,装有264兆瓦的装机容量。在1996年的发电机的常规检查期间,在单元5的一个转子蜘蛛臂中发现了裂缝。2002年据报道缺陷已经生长,从而产生了单位的操作耐久性的问题。在过去的三年里,缺陷在数量和尺寸增加。常规监测已被用于跟踪裂缝的增长率和预计失败的时间。工程评估包括有限元分析,得出结论,缺陷可能会损害发电机的完整性,最差情况导致转子和定子的广泛损坏。本文介绍了更换转子蜘蛛臂的复杂任务,这是远远超过水电发电机上进行的正常常规维护的承诺。概述了转子缺陷,条件监测和工程评估的概要,导致修复发电机转子的决定。此外,提出了物理修复工作,包括使用感应加热,臂制造和更换,重新组装和佣金来移除转子轮辋。该作品突出了日常工程评估的好处和资产管理的主动方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号