首页> 外文会议>International MultiConference of Engineers and Computer Scientists >Model and Solution Method for Railroad Crew and Vehicle Rescheduling
【24h】

Model and Solution Method for Railroad Crew and Vehicle Rescheduling

机译:铁路机组和车辆重新安排的模型与解决方法

获取原文

摘要

The crew rescheduling problem (CRP) and the vehicle rescheduling problem (VRP) are problems of reactively making schedules for a set of crews or vehicles in response to transport disorder and changes in train operations. We propose a 0-1 integer programming model for CRP/VRP based on the multicommodity flow network, and approximation method with heuristics and local search. The proposed model is used to formalize a "difference from the original schedule", which is a significant criterion in solving CRP/VRP. Experimental results to real-world data of vehicle rescheduling are also described.
机译:船员重新安排问题(CRP)和车辆重新安排问题(VRP)是反应地为一组机组人员或车辆进行反应性调度的问题,以应对运输障碍和火车操作的变化。我们为基于多商品流量网络的CRP / VRP提出了0-1个整数编程模型,以及具有启发式和本地搜索的近似方法。所提出的模型用于将“与原始时间表的差异”正规化,这是解决CRP / VRP的重要标准。还描述了对现实世界的车辆重新安排数据的实验结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号