首页> 外文会议>International Conference on Safety of Radioactive Waste Disposal >NEW FACILITIES, REASSESSMENT OF EXISTING FACILITIES AND DECISION MAKING ON UPGRADING SAFETY OF RADIOACTIVE WASTE DISPOSAL FACILITIES
【24h】

NEW FACILITIES, REASSESSMENT OF EXISTING FACILITIES AND DECISION MAKING ON UPGRADING SAFETY OF RADIOACTIVE WASTE DISPOSAL FACILITIES

机译:新设施,重新评估现有设施和决策,提升放射性废物处理设施安全

获取原文

摘要

The session, involving contributions from 11 countries, comprised three invited presentations, a report on five contributed papers, and a panel discussion. Two of the invited presentations dealt with the reassessment and upgrading of existing facilities from the viewpoint of the regulator and imple-menter, respectively. The third presentation was devoted to regulatory review and licensing in a more generic way, based on the conclusions reached in the IAEA's ASAM programme. In the generic presentation, it was stated that the regulatory review of safety cases and safety assessments is essential for credible decision making on the licensing or authorization of radioactive waste disposal facilities. The regulatory review process typically includes ensuring that the disposal facility will not cause any adverse impacts, providing assurance that the safety assessment has been conducted adequately, verifying that the results of the safety assessment comply with regulatory requirements, ensuring that measures to mitigate possible impacts have been identified and ensuring that uncertainties have been identified and taken account of. The whole process must be transparent. Some potential difficulties in conducting regulatory reviews were raised, including issues of project and programme management, limited resources for reviews, conflicts due to multiple regulatory agencies and difficulties in assessing the potential long term behaviour of systems.
机译:涉及来自11个国家的捐款的会议包括三个邀请的介绍,关于五个贡献文件的报告以及小组讨论。两个受邀介绍分别从监管机构和IMPER-MENTER的角度处理了现有设施的重新评估和升级。根据国际原子能机构阿姆姆计划达成的结论,第三次陈述致力于以更广泛的方式进行监管审查和许可。在通用介绍中,有人指出,对安全案件和安全评估的监管审查对于放射性废物处理设施的许可或授权的可信决策至关重要。监管审查过程通常包括确保处置设施不会导致任何不利影响,提供安全评估的安全评估,验证安全评估结果符合法规要求,确保措施减轻可能的影响已被确定并确保已经确定并考虑了不确定性。整个过程必须是透明的。在进行监管评论中的一些潜在困难提出,包括项目和方案管理的问题,有限的资源,其评价有限,由于多项监管机构以及评估系统潜在长期行为的困难。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号