首页> 外文会议>International South East Asia Hydrocarbon Flow Measurement Workshop >Statfjord Late Life Project Flow Measurement From Study To Start Up
【24h】

Statfjord Late Life Project Flow Measurement From Study To Start Up

机译:STATFJORD LEAD LEVEL项目流量测量从学习开始启动

获取原文

摘要

The Statfjord late life project is intended to improve oil/gas recovery from this Statoil Hydro-operated North Sea field, with the intention of keeping it on-stream until 2018-20. Statfjord A, B and C have been subject to substantial challenging modifications in order to produce more gas. These modifications have been carried out while all three platforms were in full operation. Gas production from Statfjord A, B & C is exported via a new pipeline called Tampen Link to the FLAGS transport system, which runs from Britain's Brent field near Statfjord to St. Fergus in Scotland. In order to increase export capacity to the UK, a new metering system had to be installed on the Statfjord B. The final solution for a fiscal flow measurement skid containing two parallel runs based on Ultrasonic Meters (USM) plus a new analyser system has been subject to evaluation from the conceptual studies to the Detail Engineering. The main objective was to comply with the Gas Sales Agreement and Regulatory requirements. For Statfjord A & C the existing orifice plate skids are re-used with upgrade of the control systems and analysers systems. Existing gas analysis measurement equipment for the Statfjord A & C Platforms have been required to be upgraded from single to redundant systems. Close collaboration between Oil Company, Engineering contractor and Metering/Analyser skid supplier has contributed to successfully completing a challenging Project. This paper will review the different project phases focusing on: (1) USM skid, control system including diagnostics tools. (2) Analyser systems including GC, H2S & water Dew point.
机译:STATFJORD LEATE LEVEL项目旨在改善该驻罗油流动的北海领域的石油/天然气回收,意图直到2018-20直到2018-20。 STATFJORD A,B和C一直受到大量挑战性的修改,以产生更多的气体。已经进行了这些修改,而所有三个平台都处于全部运行状态。 STATFJORD A的天然气生产,B&C通过一个名为坦布的新的管道出口到旗帜运输系统,从英国的布伦特领域运行Statfjord到St. Fergus在苏格兰。为了增加英国的出口能力,也必须在Statfjord B上安装一个新的计量系统。已经存在基于超声仪表(USM)加上新分析仪系统的两个平行运行的财政流量测量SKID的最终解决方案受到评估,从概念研究到细节工程。主要目标是遵守燃气销售协议和监管要求。对于STATFJORD A&C,现有的孔板SPIRD可以重新使用控制系统和分析仪系统的升级。已经需要从单一到冗余系统升级STATFJORD A&C平台的现有气体分析测量设备。石油公司,工程承包商和计量/分析仪滑雪供应商之间密切合​​作有助于成功完成一个具有挑战性的项目。本文将审查专注的不同项目阶段:(1)USM SkID,控制系统,包括诊断工具。 (2)分析仪系统,包括GC,H2S和水露点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号