首页> 外文会议>Iron and Steel Technology Conference >Heating Value and Waste Gas Flow Controlled Exhaust Gas Combustion for a 150-Ton RH-TOP Degasser at Big River Steel
【24h】

Heating Value and Waste Gas Flow Controlled Exhaust Gas Combustion for a 150-Ton RH-TOP Degasser at Big River Steel

机译:加热值和废气流量控制的150吨Rh-The The The Big River Steel的Rh-Thap Rop脱气器的废气燃烧

获取原文

摘要

Big River Steel started up in Osceola, Ark., USA, in 2016. The entire plant was supplied by SMS group. A 150-ton RH-TOP unit was selected for producing steels with ultralow carbon contents, achieved during the decarburization process. Meanwhile, considerable amounts of CO are generated. U.S. federal regulations require that combustible process gases have to be burnt with a heating value of at least 200 BTU/scf. To follow that regulation, a new flare stack burner concept was developed to combust CO-containing exhaust gases and reduce the environmental impact in the form of CO_2 emissions.
机译:大河钢在Osceola,Ark。,美国,2016年。整个工厂由SMS集团提供。 选择150吨的Rh-Top单元用于用超级碳含量生产钢,在脱碳过程中实现。 同时,产生了相当大量的CO。 美国联邦法规要求可燃过程气体必须燃烧至少200 btu / scf的加热值。 要遵循该规定,开发了一种新的火炬堆燃烧器概念,以燃烧含有共同的废气,并降低CO_2排放形式的环境影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号