Operational Results of the U. S. Steel - Gary Works No. 4 Blast Furnace After Installation of the Compact Bell Less Top

机译:U. S.钢铁 - 加里工程的运营结果4号高炉安装紧凑型贝尔较少的顶部

获取原文

摘要

U. S. Steel relocated a Paul Wurth Compact Bell Less Top from its idle A-1 blast furnace at Great Lakes Works to its No. 4 blast furnace at Gary Works. Repurposing the top from A-1 furnace helped to keep the project costs to a minimum. U. S. Steel worked jointly with Paul Wurth to install the refurbished Bell Less Top in December 2015, replacing the existing McKee distributor, two-bell top. There were several potential benefits that had to be achieved to make the project a financial success. These included improved burden distribution and increased furnace efficiency, which in turn would result in decreased total fuel rate, improved hot metal chemistry, and reduced maintenance time with longer equipment service life. We shall review the installation of the refurbished top on Gary Works No. 4 blast furnace, commissioning the equipment, optimizing burden distribution, along with operational results from the first two years of service. Total fuel rate has decreased while maintaining required hot-metal production levels.
机译:U. S. Steel重新安置了Paul Wurth Compact Bell,从它的闲置A-1高炉上的顶部,在Gary Works的4号高炉上。从A-1炉中重新施加顶部有助于将项目成本降至最低。美国钢铁与保罗沃特共同锻炼,在2015年12月安装翻新的贝尔减少榜首,取代现有的McKee经销商双铃铛顶部。有几种潜在的好处,必须实现项目的财务成功。这些包括改善的负荷分布和提高的炉效,这反过来将导致总燃料速率降低,改善热金属化学,以及更长时间的设备使用寿命,降低维护时间。我们将审查在Gary Works的翻新顶部安装4号高炉,调试设备,优化负担分配,以及服务的前两年的运营结果。总燃料速率在保持所需的热金属生产水平同时降低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号