首页> 外文会议>Iron and Steel Technology Conference >Stockhouse-Based De-Icing, Drying and Pre-Heating of Coke and Pellets
【24h】

Stockhouse-Based De-Icing, Drying and Pre-Heating of Coke and Pellets

机译:基于库存的去结冰,干燥和焦炭和颗粒预热

获取原文
获取外文期刊封面目录资料

摘要

Stable operation of a blast furnace requires careful consideration of dozens of inputs and factors. Heat and mass balance at the top of the furnace are those among the key factors to be taken into account. High temperatures at the top mean extra heat loss, process inefficiency, high dust emission, unnecessary load to the charging equipment, uptakes, downcomer and gas cleaning plant. Temperatures below a certain threshold mean moisture that enters the furnace with the raw materials will not get evaporated and the "process" water that ascends from the lower furnace will be condensed. As such the top part of the burden will start accumulating the water resulting in reduced "process height" of the blast furnace available for the physical and chemical reactions. Therefore, furnace operators balance the process conditions at the furnace top to the acceptable operating regime.
机译:高炉稳定运行需要仔细考虑数十种输入和因素。炉子顶部的热量和质量平衡是要考虑的关键因素中的热量平衡。顶部平均热损失的高温,工艺低效率,高粉尘排放,不必要的负荷,对充电设备,上床,降低者和气体清洗厂。低于一定阈值平均水分的温度,将炉子与原料进入原料,不会蒸发,并且“过程”水将凝结从下部炉子上升。由于这种负担的顶部将开始积聚水,导致高炉可用于物理和化学反应的高炉的“工艺高度”。因此,炉子运营商将炉顶的过程条件平衡到可接受的操作制度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号