首页> 外文会议>Iron and Steel Technology Conference >Benefits of Installing a Side-stream Filter on an Electric Arc Furnace Non-Contact Cooling System
【24h】

Benefits of Installing a Side-stream Filter on an Electric Arc Furnace Non-Contact Cooling System

机译:在电弧炉上安装侧流过滤器的优点是非接触式冷却系统

获取原文
获取外文期刊封面目录资料

摘要

This paper will describe the benefits in chemical cost reduction, equipment life, and maintenance associated with the installation of a side-stream filter on the Timken Faircrest electric arc furnace (EAF)/ladle refining station (LRS) non-contact cooling system in 2012. The Timken Faircrest steelmaking facility was started in August 1985. The electric arc furnace capacity is 175 tons. One million tons of steel are produced each year, via bottom poured ingots. GE Power and Water (formerly Betz Laboratories) began treating the Faircrest facility in 1999.
机译:本文将在2012年在Timken Faircrest电弧炉(EAF)/钢包精炼站(LRS)非接触式冷却系统上安装与安装与安装侧流过滤器相关的化学成本降低,设备寿命和维护的益处。Timken Faircrest SteelMake设施于1985年8月开始。电弧炉容量为175吨。每年生产一百万吨钢,通过底部浇注锭。 GE POWER和WITY(前身BETZ实验室)于1999年开始对待菲尔特集团。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号