首页> 外文会议>Iron and Steel Technology Conference >Six Weeks: Cold Mill Engineering to First Coil
【24h】

Six Weeks: Cold Mill Engineering to First Coil

机译:六周:冷轧工程至第一个线圈

获取原文

摘要

In late September 2013, Primetals Technologies was contacted by a domestic cold mill facility to assist in achieving a tight time critical automation modernization project only weeks before its November implementation. The key project goal was to replace a nearly 20 year-old level 1 technological control system for a critical single-stand aluminum cold mill due to equipment obsolescence. The primary constraint was that this modernization was to take place during the course of a previously planned 10-day mechanical outage for the reconditioning of the existing gearboxes. Coming out of this outage, the new automation had to be in place and produce first marketable coil as quickly as possible. In fact, it was paramount that the time from outage-end to first coil and then regular production be minimized. Normally, a cold mill automation package with hardware ready for commissioning is a deliverable with a timeframe measured in months, not weeks-making this a very strenuous request. Thanks to the design and flexibility of a technological product designed specifically for cold mills, Primetals Technologies was able to answer this customer's critical call for help: In only 6 weeks, the new automation system was engineered, installed and the first coil achieved.
机译:2013年9月下旬,国内冷轧机构联系了Primetals Technologies,以协助在11月实施之前只有几周内完成关键的自动化现代化项目。关键项目目标是取代近20岁的1级技术控制系统,为临界单架铝冷轧机引起的,由于设备过时。主要约束是,在先前计划的10天机械停用的过程中发生这种现代化,以便对现有齿轮箱的修复进行修复。出现在这一中断之外,新的自动化必须尽快到位,并尽快生产第一个可销售线圈。事实上,这是最重要的是,停电站到第一个线圈然后定期生产的时间最小化。通常情况下,具有用于调试的硬件的冷轧自动化封装是一个在数月中测量的时间范围的可交付,而不是几周制作这个非常艰苦的请求。由于专为冷轧机设计的技术产品的设计和灵活性,Primetals技术能够回答这位客户的批判性呼吁:仅在6周内,新的自动化系统被设计,安装并实现了第一卷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号