【24h】

Field Development Optimization Technology

机译:现场开发优化技术

获取原文

摘要

This paper describes the development and application of a new field development technology to optimize the locations of new and sidetracked wells within an oil or gas field, the drilling schedule, water and gas injection strategies, production/injection rates, and surface facilities. The field development plan optimization is informed using BP’s Top-Down Reservoir Modeling (TDRM) methodology. An economic indicator (e.g. net present value, incremental rate of return, capital efficiency, discounted payback, etc.) or oil/gas recovery is maximized subject to field development constraints. Only drilling targets in geologically defined areas are considered. Sidetrack wells are additionally limited by distance from their parent well. Drilling rig constraints (rig availability, drilling time, drilling costs, etc.) are incorporated. Economic constraints on project costs are also taken into account. Multiple integrated reservoir models, representing different combinations of sub-surface description and surface facilities, can be handled within this new field development optimization system. The system generates the optimum field development option by maximizing a percentile of either the selected economic indicator or the oil/gas recovery. Associated risks can be considered as constraints. Probability distribution functions of the maximized objective function and associated constraints are determined with a powerful optimization procedure developed using a combination of public and proprietary techniques. A large range of field development issues from well locations, drilling schedule, injection strategy and facilities modifications can be addressed. Applications of the developed technology for field development optimization in a giant new offshore oil field, and a mature oil field are presented. These applications clearly demonstrate that the new development optimization technology is a sufficien tly general tool for analysis to inform field development planning. Significant improvements in oil recovery, sweep efficiency, and net present value are demonstrated in the comparison with the reference field development cases.
机译:本文介绍了新的现场开发技术的开发和应用,以优化石油或天然气场内的新和侧面井的位置,钻探时间表,水和气体注射策略,生产/注射率和表面设施。使用BP的自上而下水库建模(TDRM)方法通知现场开发计划优化。经济指标(例如,净目前价值,返回的增量率,资本效率,折扣回报等)或石油/天然气回收是最大化的现场发展限制。仅考虑地质定义区域中的钻井目标。 Sidetrack孔另外限制距离父母井。钻机限制(Rig Iasability,钻井时间,钻井成本等)。还考虑了对项目成本的经济限制。多集成储层模型,代表子表面描述和表面设施的不同组合,可以在新的现场开发优化系统中处理。系统通过最大化所选经济指标或石油/气体回收的百分位数来产生最佳场开发选项。相关的风险可以被视为约束。利用使用公共和专有技术的组合开发的强大的优化过程来确定最大化的目标函数和相关约束的概率分布函数。可以解决从井位置,钻井时间表,注射策略和设施修改的大量现场开发问题。展示了巨型新型海上油田现场开发优化的开发技术的应用及成熟油田。这些应用程序清楚地表明,新的开发优化技术是用于分析现场开发规划的Suffien Tly General工具。与参考现场开发病例的比较,证明了对石油回收,扫效效率和净目的值的显着改善。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号