首页> 外文会议>Pipeline Division Specialty Conference >HDD – Cartridge Method and 24-Inch (610mm) Ductile Iron Pipe Key To Minimizing Surface Disruption In Hillsborough County
【24h】

HDD – Cartridge Method and 24-Inch (610mm) Ductile Iron Pipe Key To Minimizing Surface Disruption In Hillsborough County

机译:HDD - 墨盒方法和24英寸(610mm)的球墨铸铁钥匙,以最大限度地减少Hillsborough县的表面破坏

获取原文

摘要

In the past two decades, the Hillsborough County Water Resource Service Department (HCWRS) has been actively expanding its reclaimed water system in the South-Central service area, both as an effluent disposal method and as a potable water saving mechanism. Currently the HCWRS reclaimed water customer base is comprised of golf course users, industrial users, commercial and residential customers.To meet increasing demands in the south-central service area and pressure requirements during the peak hours, HCWRS has identified the need for additional Reclaimed Water Transmission Main (RWTM) capacity along Lithia Pinecrest Road and Bloomingdale Avenue To serve high demands of the fast growing communities in Hillsborough County, Florida, HCWRS is challenged with designing new transmission mains within highly congested and restricted right-of-way. For each project the Water Department designers must be conscious of the impact of surface disruption and the associated socio-economic costs to the general public, as well as the projects’ overall cost. The design for the 24” (610mm) transmission main in Lithia-Pinecrest Road, a two-lane thoroughfare, was no different. This project was complicated by the volume of traffic in combination with portions of the alignment transitioning through a very congested right of way. The line begins at the intersection of Lithia Pinecrest Road and Bloomingdale Avenue, an east-west arterial highway and proceeds in a southeasterly direction for approximately 12,500’ (3.6 km) on an alignment that takes it past schools, businesses, and residential areas, and terminates at the entrance to River Hills Country Club.
机译:在过去的二十年中,Hillsborough县水资源服务部门(HCWRS)一直在积极扩展其在南中央服务区的再生水系统,既是流出物处理方法也是一种饮用节水机制。目前,HCWRS再生水客户群由高尔夫球场用户,工业用户,商业和住宅客户组成。在高峰时段的南部服务区和压力要求上满足日益增长的需求,HCWR已经确定了需要额外的再生水沿着Lithia Pinecrest Road和Bloomingdale途径的传输主要(RWTM)容量在佛罗里达州Hillsborough County的快速种植社区提供高要求,HCWRS在高度拥挤和限制的公权中设计新的传输电源挑战。对于每个项目,水部门设计师必须意识到表面中断和相关的社会经济成本对公众的影响,以及项目的总体成本。 24“(610mm)传输主要的设计在Lithia-pinecrest道路,双车道通道中没有任何不同。该项目的交通量与通过非常拥挤的方式转换的部分交通相结合。该行开始在利西亚斯普派恩克雷斯特路和Bloomingdale大道的东西向干线公路和收益交叉口东南方向约12500' (3.6公里)对需要它过去的学校,企业和居民住宅区的定位,并终止于河山乡村俱乐部的入口处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号