In the past two decades, the Hillsborough County Water Resource Service Department (HCWRS) has been actively expanding its reclaimed water system in the South-Central service area, both as an effluent disposal method and as a potable water saving mechanism. Currently the HCWRS reclaimed water customer base is comprised of golf course users, industrial users, commercial and residential customers.To meet increasing demands in the south-central service area and pressure requirements during the peak hours, HCWRS has identified the need for additional Reclaimed Water Transmission Main (RWTM) capacity along Lithia Pinecrest Road and Bloomingdale Avenue To serve high demands of the fast growing communities in Hillsborough County, Florida, HCWRS is challenged with designing new transmission mains within highly congested and restricted right-of-way. For each project the Water Department designers must be conscious of the impact of surface disruption and the associated socio-economic costs to the general public, as well as the projects’ overall cost. The design for the 24” (610mm) transmission main in Lithia-Pinecrest Road, a two-lane thoroughfare, was no different. This project was complicated by the volume of traffic in combination with portions of the alignment transitioning through a very congested right of way. The line begins at the intersection of Lithia Pinecrest Road and Bloomingdale Avenue, an east-west arterial highway and proceeds in a southeasterly direction for approximately 12,500’ (3.6 km) on an alignment that takes it past schools, businesses, and residential areas, and terminates at the entrance to River Hills Country Club.
机译:在过去的二十年中,希尔斯伯勒县水资源服务部(HCWRS)一直在积极扩展其在中南部服务区的再生水系统,既作为废水处理方法,又作为一种节水机制。目前,HCWRS的再生水客户群包括高尔夫球场用户,工业用户,商业和住宅用户。为满足中南部服务区日益增长的需求以及高峰时段的压力要求,HCWRS确认需要额外的再生水沿Lithia Pinecrest Road和Bloomingdale Avenue的输电干线(RWTM)容量为了满足佛罗里达州希尔斯伯勒县快速增长的社区的高要求,HCWRS面临的挑战是在高度拥挤和受限的通行权内设计新的输电干线。对于每个项目,水务部门的设计人员必须意识到地表破坏的影响以及相关的社会经济成本对公众以及项目的整体成本。两条车道的利西亚-皮内克雷斯特路(Litia-Pinecrest Road)的24英寸(610毫米)变速箱总管的设计没有什么不同。由于交通量大,加上路线的一部分通过非常拥挤的通行权过渡,使得该项目变得复杂。该线路始于东西公路干线Lithia Pinecrest Road与Bloomingdale Avenue的交汇处,向东南方向行进约12,500英尺(3.6公里),并经过学校,企业和居民区,在River Hills乡村俱乐部的入口处终止。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号