首页> 外文会议>Pipeline Division Specialty Conference >CONSTRUCTABILITY OF LARGE DIAMETER PIPELINES IN AN URBAN ENVIRONMENT: A CASE STUDY
【24h】

CONSTRUCTABILITY OF LARGE DIAMETER PIPELINES IN AN URBAN ENVIRONMENT: A CASE STUDY

机译:城市环境大直径管道的结构 - 以案例研究

获取原文
获取外文期刊封面目录资料

摘要

The City of Baltimore (City), Maryland has recently undertaken an extensive program to upgrade and rehabilitate their aging sewer system. The City, whose aging infrastructure has led to the necessity to replace and upgrade their existing systems, is under an Administrative Consent Order (ACO) to bring their system into compliance with state and federal regulations and to cease polluting the Chesapeake Bay. As part of the ACO, the City is required to upgrade the force main servicing the New Jones Falls River Basin. The work to be performed includes, in part, upgrading the existing pump station, upgrading the gravity sewer, and replacing the existing 36" force main. The replacement of the 36" diameter force main requires the installation of 42", 48" and 54" Prestressed Concrete Cylinder Pipe through city streets at depths well in excess of 20 feet and, in some instances, in excess of 30 feet. In order to complete this upgrade, the pipelines that are required to provide the City with sewer services are both larger in diameter and more difficult to construct than the existing ones. What is more, the presence of existing utilities makes it more difficult for engineers to find non-conflicting routes for the new pipelines. As a result, the new pipe lines are requiring extensive relocation of existing utilities; they are being constructed deeper and are becoming more costly to the owner. This paper will follow the New Jones Falls Force Main Project through the following phases: Design; Bidding; and Construction; with the main emphasis on the Construction Phase.
机译:马里兰州巴尔的摩市(市)最近开展了一项广泛的计划,升级和恢复老化的下水道系统。这座城市,其老化基础设施导致必要的必要性替换和升级其现有系统,是在行政同意令(ACO)中,使其系统符合国家和联邦法规,并停止污染切萨皮克湾。作为ACO的一部分,该市必须升级新琼斯瀑布河流域的力量主要服务。要执行的工作包括升级现有的泵站,升级重力下水道,并更换现有36“力主。替换36”直径力主要需要安装42“,48”和54 “预应力的混凝土气缸管通过城市街道的深度超过20英尺,在某些情况下,超过30英尺。为了完成这一升级,提供所需的流水线,提供了下水道服务的城市都更大直径和更难以构造而不是现有的。更重要的是,现有公用事业公司的存在使工程师更加困难,以找到新管道的非冲突路线。因此,新的管道需要广泛的重新定位现有公用设施的;他们正在建设深入和越来越昂贵的业主本文将遵循新的琼斯瀑布主力军项目经历以下几个阶段:设计;招标;和缺点生育;主要重视建设阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号