Lessons Learned - Lining Asbestos Cement Sewer Main

机译:经验教训 - 衬里石棉水泥下水道主要

获取原文

摘要

This paper presents information on the investigation and lessons-learned during recent cured-in-place (CIP) lining project in which the host pipe was an asbestos cement (AC) sewer main. Due to deterioration of the main, swelling of the AC material resulted in reduction of the inside diameter of the pipe. Upon installation and curing of the liner material, wrinkles were noted during the follow-up inspection. Material testing and inspection were conducted to determine what, if any, impacts the wrinkling would have on the pipe's integrity. This paper examines the process of installing the CIP liner, examination of the final product and the resulting impacts of the wrinkles.
机译:本文介绍了有关近期固化(CIP)衬里项目的调查和经验教训的信息,其中主管是石棉水泥(AC)下水道主要。由于主要的劣化,交流材料的溶胀导致管道内径的减少。在安装和固化衬里材料时,在后续检查期间注意到皱纹。进行了物料测试和检查,以确定皱纹的皱纹造型的任何影响,如果有的话。本文研究了安装CIP衬垫,检查最终产品的过程和皱纹的产生影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号